Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Marina del Rey
A full kitchen remodel in Marina del Rey typically runs $14,000 to $45,000, and most projects here take 6 to 12 weeks depending on permit layers. But Marina del Rey is not like remodeling in Culver City or Mar Vista. The salt air, the county ground leases, the Coastal Zone, and the liquefaction-prone fill under nearly every building all change the materials, the permit path, and the real cost. We know because we’ve pulled those permits and installed those kitchens here. Call (877) 610-1318 for a free estimate, and we’ll walk you through what your specific building will actually require.
If you’re pricing a kitchen remodel in Marina del Rey, start with the right questions: does your condo tower need lessor sign-off? Will the Coastal Commission need to review structural changes? And are the cabinet hinges and island anchors you’re being quoted actually marine-grade, or will they rust out in two years? We’ll cover all of that below.
Why Barrett & Sons Construction Is Marina del Rey’s Preferred Kitchen Remodeling Company
Tom Barrett founded Barrett & Sons Construction in 1998, and his sons run the crews. We’re not a franchise dispatching strangers in unbranded vans. We answer our own phone, and a live person picks up 24/7. That matters when you’re juggling a condo board, a county inspector, and a contractor who promised a permit but never pulled one.
We’ve remodeled kitchens at every ZIP in Marina del Rey, 90292 and 90295. We know the difference between a slab-on-grade condo tower near Admiralty Way and a wood-frame unit off Via Marina. We know which buildings have post-tension slabs, which need county lessor sign-off before rough-in, and which kitchen layouts actually work in a 1970s galley that was designed for a different era. Our Kitchen Remodeling team has handled all of it.
Every job gets a written change order before any scope changes. Every eligible job gets permits pulled and inspections signed. And every completed project carries the 90-Day Done Right Promise, written on the contract. Tom Barrett publishes his name, address, and license number. Look it up before you sign anything.
Our Kitchen Remodeling Services in Marina del Rey
Kitchen Design & Layout
Kitchen layout in Marina del Rey often means working within a concrete-frame condo footprint that can’t be expanded outward. That changes where the island goes, how plumbing is routed, and whether a load-bearing wall can move at all. We design kitchens that work inside the existing structural skeleton, and we’ll tell you honestly if an open-concept wall removal will trigger a geotechnical review, a Coastal Development Permit, or both.

Cabinet Installation & Refacing
Cabinet installation here is a materials conversation before it’s a labor conversation. Standard zinc-plated hinges and drawer slides, the kind that work fine in inland Mar Vista, rust within two years in the marine air off the Pacific. We specify stainless-steel or coated hardware on every cabinet job near the water, and we’ve refaced enough 1970s and 1980s condo kitchens to know exactly what fits inside those old cabinet boxes.

Quartz & Granite Countertops
Countertop seams open at the backsplash in Marina del Rey more than any coastal city we work in. The reason is the fill. Most of the marina sits on engineered fill over former tidal wetlands, and buildings settle slowly, year after year. A rigid caulk joint cracks. We use elastomeric sealant at every seam and backsplash junction, and we spec countertops from Cambria and other premium brands. A typical countertop installation in Marina del Rey runs $2,000 to $6,500.

Backsplash, Tile & Flooring
Backsplash and tile work near the coast needs one thing: movement accommodation. Salt air and building settlement both stress grout lines. We install tile with flexible thinset and sealant at all plane changes, and we’ll recommend through-body porcelain rather than ceramic for any floor in a beach-adjacent unit. A backsplash installation in Marina del Rey typically runs $800 to $2,500.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Marina del Rey
We install KraftMaid cabinetry and Cambria quartz in kitchens throughout Marina del Rey, and we’re familiar with the full material list a coastal condo job actually requires. For hardscape adjacent to a remodel, we also work with Techo-Bloc and Belgard. The point isn’t a brand name on a sticker; it’s materials you can look up, with specifications that hold up against salt air and settlement. If you’re comparing quotes, ask the other contractor which cabinet hinge they spec and what sealant they use at the countertop seam.
Common Kitchen Remodeling Problems We See in Marina del Rey Homes
- Rusted cabinet hardware within two years. Standard zinc-plated hinges fail fast in marine air. We spec stainless or coated hardware on any kitchen within a mile of the water.
- Countertop seams opening at the backsplash. Buildings on liquefaction-prone fill settle. Rigid caulk cracks. We use elastomeric sealant at every seam and change-of-plane joint.
- Permits pulled under the wrong jurisdiction. Marina del Rey is unincorporated LA County, not City of LA. A contractor who pulls an LA City permit for a kitchen island electrical rough-in will fail inspection and stall the project for weeks. We pull through LA County DPW, every time.
- Lessor sign-off delays. Most parcels here sit on LA County ground leases. Any kitchen remodel that alters load-bearing walls or adds a plumbed island requires county lessor approval before permit submission. Out-of-area contractors don’t know this step exists until it stops the job.
Pricing for Kitchen Remodeling in Marina del Rey, CA
Here’s what we charge in the Marina del Rey market. These are honest ranges, not teaser numbers meant to get a signature before the real invoice shows up.
| Service | Typical Range in Marina del Rey |
|---|---|
| Full Kitchen Remodeling | $14,000 - $45,000 |
| Small Kitchen Remodel | $9,000 - $20,000 |
| Cabinet Installation | $4,000 - $13,000 |
| Countertop Installation | $2,000 - $6,500 |
| Backsplash Installation | $800 - $2,500 |
| Kitchen Island Installation | $3,000 - $10,000 |
The coastal-spec upgrades add 8 to 15 percent to the inland price of a kitchen. Stainless hardware, epoxy-coated anchors, elastomeric sealants, marine-grade fasteners. The cheap spec costs less today and more within a decade, when you’re replacing rusted hinges and re-caulking cracked seams. Every scope, every allowance, every price change gets written before work moves. Call (877) 610-1318 for a free estimate on your Marina del Rey kitchen.
What Coastal-Spec Actually Costs in Marina del Rey
Almost the entire community of Marina del Rey was built on artificially filled former tidal wetlands and marshland after the harbor opened in 1965. Nearly every parcel sits inside a state-mapped liquefaction hazard zone. That means any kitchen remodel that touches load-bearing structure, or any major ground-up addition, may require a geotechnical study or even deep pile foundations, work that wouldn’t be assumed necessary a mile east in Culver City. And because Marina del Rey is unincorporated Los Angeles County, not City of LA, permits run through LA County DPW. On top of that, the entire community sits inside the California Coastal Zone, so any structural construction also requires a Coastal Development Permit from the California Coastal Commission. That dual layer catches out-of-area contractors every single time.
The housing stock here was built in a compressed window from roughly 1965 through 1985: mid-rise concrete-frame and wood-frame condominium towers and large apartment buildings, now 40 to 60 years old. That inventory is aging into a wave of SB 721 balcony replacements, post-tension slab repairs, and waterproofing envelope overhauls. A kitchen remodel in one of these buildings usually means working around building-wide structural work, not just your own unit’s cabinets.
One more layer: most parcels sit on LA County ground leases, not fee-simple land. Any kitchen remodel that alters load-bearing walls or adds an island with plumbing requires county lessor sign-off before permit submission. That approval step simply doesn’t exist for contractors working in incorporated Venice or Culver City. If your contractor doesn’t know to ask for it, the permit desk will tell you both.
We recently remodeled a kitchen in a 1978 condo tower near Admiralty Way where the slab-on-grade subfloor had chloride-driven rebar corrosion from decades of marine air. Our crew specified epoxy-coated anchors for the new island rough-in and stainless-steel cabinet hardware, then worked through the Coastal Development Permit and county lessor sign-off before first inspection. The dual layer delayed schedule by three weeks, but it prevented a future change order and a failed inspection. That’s the correct order: paperwork first, then the work.
We Also Serve Cities Near Marina del Rey
Barrett & Sons Construction works throughout the South Bay and Westside. We serve Marina del Rey, plus Lawndale, Hermosa Beach, Redondo Beach, and Hawthorne. If you’re in one of those cities and need a Kitchen Remodeling in Marina del Rey team that understands coastal conditions, county pernit requirements, and ground lease sign-offs, we’ll come out and give you a straight answer.
Serving Marina del Rey, CA - Our Local Coverage Area
We’re based in the Marina del Rey area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Kitchen Remodeling in Marina del Rey
A Coastal Development Permit is required if your kitchen remodel involves structural changes to the building shell or exterior. Cosmetic interior work, like replacing cabinets, counters, and backsplash in place, typically doesn’t trigger one. But if you’re moving or removing a load-bearing wall, adding a window or door, or altering any structural element, yes, the California Coastal Commission has jurisdiction because all of Marina del Rey sits inside the Coastal Zone. We’ll tell you up front whether your scope triggers it. Call (877) 610-1318 and describe your project, and we’ll give you a straight answer.
Because most condo towers here sit on LA County ground leases, not fee-simple land, the county is the lessor and holds an interest in the property. Any substantial interior structural change, and in some buildings any remodel that touches plumbing or electrical, requires written lessor approval before you can submit for a permit. If your contractor doesn’t know to ask, the permit gets rejected and your schedule stalls. Call us at (877) 610-1318 and we’ll help you figure out whether your building is on a county lease and what sign-off you need.
For any kitchen within a mile of the water in Marina del Rey, specify stainless-steel or powder-coated hinges, slides, and handles. Standard zinc-plated hardware rusts within two years in the marine air. The upgrade costs a few hundred dollars on a typical cabinet job and saves a full hardware replacement later. Every cabinet installation we do near the coast gets marine-grade hardware by default. We’ll include it in your written estimate, so you can see exactly what you’re paying for.
Salt air itself doesn’t corrode quartz or granite, but the building settlement on Marina del Rey’s engineered fill, combined with coastal temperature swings, stresses seams and backsplash joints. Rigid caulk fails and the seam opens. We use elastomeric sealant at every seam and junction so the joint flexes instead of cracking. A countertop installation in Marina del Rey typically runs $2,000 to $6,500, and the right sealant spec is part of that price, not an upgrade.
If you’re changing load-bearing walls, relocating a plumbed island onto a new location, or doing any structural work, it may trigger a geotechnical review because nearly all of Marina del Rey sits inside a state-mapped liquefaction hazard zone. Cosmetic cabinet and countertop swaps do not. When we scope your remodel, we’ll tell you exactly which items will require geotechnical input and what that adds to the timeline. Call (877) 610-1318 and we’ll walk you through it.
Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Marina del Rey since 1998.







Before
After
Before
After
Before
After