Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Miami Springs
If you live in Miami Springs, adding square footage to your home is never as simple as a plan and a permit. It usually starts with the airport question. Miami Springs sits under the approach corridors for Miami International Airport, so any vertical addition, a second story, a detached ADU with real height, even a rooftop HVAC platform, can trigger FAA Part 77 airspace obstruction review before Miami-Dade County will even look at your building permit. That one layer filters out most out-of-area contractors on day one. We work inside that reality every week. If you’re planning a room addition, garage conversion, or ADU in Miami Springs, call Barrett & Sons Construction at (877) 610-1318 and we’ll walk you through what the city and the FAA will actually ask for.
Why Barrett & Sons Construction Is Miami Springs’s Preferred Home Additions & ADU Company
Tom Barrett founded this company in 1998, and his sons run the crews. That matters in Miami Springs because the kind of homeowner who owns a 1940s Mission Revival off Curtiss Parkway isn’t looking for a franchise van and an 800 number. They want a name they can look up. Tom publishes his name, his address, and his license number. He answers his own phone, and if something isn’t done right, the 90-Day Done Right Promise is written on the contract, not buried in a footnote. One call brings Tom back.
Our Home Additions & ADU team knows Miami Springs’s housing stock well. The 1930s to 1960s concrete block and stucco homes here are solid but they hide things: single-wythe block walls, undersized electrical panels, jalousie windows, and barrel-tile roofs that have been cooking in the Miami sun longer than most contractors in South Florida have been alive. A crew that only builds new construction in Doral will misread those details. A crew that works Miami Springs regularly won’t.
We also carry the paperwork habits this city’s permitting process punishes you for skipping. Every scope change, every allowance, every price adjustment lands in your hands as a written change order before work proceeds. That’s not a courtesy in Miami Springs, it’s how you avoid a surprise invoice after the FAA review adds three weeks to your wall framing start date. The last thing a Miami Springs homeowner needs is a contractor who treats change orders like a handshake.
Our Home Additions & ADU Services in Miami Springs
We handle Home Additions & ADU projects across the 33166 ZIP code, from the oldest blocks near Prince Field to the canalside homes off Ludlam Drive. Here’s where most of our Miami Springs work lands.
ADU Design & Permitting
Most ADU conversations in Miami Springs start with a lot, not a floor plan. The city was platted by Glenn Curtiss in the 1920s as a planned community, and the lot sizes reflect that: compact, established, and often shaped around the original canal and golf course layout. A detached ADU needs setbacks, lot coverage, and drainage that fit the specific parcel, then it needs Miami-Dade High Velocity Hurricane Zone product approvals. We design and permit the whole thing. Our team on the Home Additions & ADU side handles the FAA coordination paperwork that Miami Springs parcels under the MIA approach corridors routinely trigger.

Garage Conversion ADU
A garage conversion is usually the fastest path to a rentable or in-law unit in Miami Springs, and often the cheapest, with most projects here running $35,400 to $94,400 depending on the existing slab, the electrical service size, and how much of the original garage door opening has to be rebuilt as a hurricane-rated wall. Older Miami Springs garages were often built with single-wythe CMU and no vapor barrier, so we spend real time on moisture control before insulation goes in. The 90%-plus humidity from June through October will find any shortcut you leave in those old block walls.

New Detached ADU
Miami Springs homeowners adding a detached ADU are usually doing it for a parent, an adult child, or rental income. The construction cost range here sits at $106,200 to $259,600, driven heavily by foundation type, impact-rated windows and doors, and whether the ADU’s height pokes into FAA airspace review. On a typical Miami Springs lot, the ADU footprint also has to work around mature oaks and old-growth live oaks that the city is protective of. That affects placement and sometimes even foundation design.

Junior ADU & Interior Conversion
Some Miami Springs homes don’t need a separate structure at all. A junior ADU, a lock-off suite with its own entrance and a small kitchenette, often fits inside the existing footprint of a 1950s CBS home without triggering the full detached-ADU setback rules. These conversions lean on the room’s original layout, whether that’s a den off a carport or a former maid’s quarters near the back door. It’s a smart way to get to a rentable unit or a private space for aging parents without surrendering yard space to a new structure.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Miami Springs
We don’t install mystery materials off a van. When a Miami Springs addition calls for pavers, we run Cambridge Pavers or Techo-Bloc because they hold color under South Florida UV and drain properly on Miami-Dade’s flat grades. For concrete work, we use Quikrete products matched to the mix the job actually needs, whether that’s a thickened edge slab for an ADU or a repair pour on an existing 1950s foundation. If we wouldn’t put it on Tom’s own house, it doesn’t go on yours.
Common Home Additions & ADU Problems We See in Miami Springs Homes
- FAA airspace review surprises. A second-story addition on a Miami Springs street under the MIA approach path can sit in FAA Part 77 review for weeks before the county will issue a permit. An out-of-area contractor bidding the job often doesn’t know this exists until the zoning office flags it. We budget for it from the first walkthrough, so the timeline doesn’t shift mid-project.
- Undersized electrical services in 1930s-1960s homes. Miami Springs’s original CBS homes were often built with 60-amp or 100-amp panels. Adding an ADU or a bedroom suite means new subpanels, sometimes a full service upgrade before the first wall goes up. If the last owner updated nothing since the Kennedy administration, we’ll spot it during the estimate, not after demo.
- Flat and barrel-tile roofs at end of life. When a room addition ties into an existing Miami Springs roof, the tie-in is only as good as the old roof. Many of these original barrel-tile and built-up flat roofs are decades past their service life. A good addition plan includes a roof section replacement, not just a flashing job that leaks in the first July downpour.
- HVHZ code requirements that out-of-area crews underestimate. Miami-Dade’s High Velocity Hurricane Zone standard is the toughest wind code in the continental US. Impact-rated windows, enhanced roof-to-wall strapping, and product approvals are not optional upgrades here. A Miami Springs addition built to Orlando’s code will fail inspection. We already know that.
Pricing for Home Additions & ADU in Miami Springs, FL
A home addition in Miami Springs typically runs $53,100 to $153,400. A garage conversion falls between $35,400 and $94,400, while a new detached ADU lands between $106,200 and $259,600. What moves those numbers in Miami Springs specifically: whether the addition’s height tripped FAA review, how much of the existing electrical service needs replacing, whether the roof tie-in requires a full re-roof section, and the condition of the original 1930s-1960s slab. You’ll never get a “we’ll figure it out later” number from us. Every line item, every allowance, every scope change arrives in writing before work starts. Call (877) 610-1318 for a free estimate and a written, line-item quote for your Miami Springs project.
Key Takeaways:
- A room addition in Miami Springs runs $53,100-$153,400; a detached ADU runs $106,200-$259,600.
- FAA Part 77 review is a routine extra step for vertical work near MIA approach corridors.
- Miami-Dade HVHZ code applies to every addition, window, door, and roof connection.
- Tom Barrett’s name, address, and license number are published and verifiable.
- Free estimates, written change orders, and the 90-Day Done Right Promise on every contract.
We Also Serve Cities Near Miami Springs
Most of our Miami Springs projects come from homeowners along Curtiss Parkway, around Prince Field, and in the canal neighborhoods off Ludlam Drive. We also work regularly in Hialeah Gardens, Hialeah, Gladeview, and West Little River. If you’re just outside Miami Springs and planning an ADU or addition, the same permits, the same HVHZ rules, and the same FAA overlay issues usually apply. We know those neighborhoods too.
Serving Miami Springs, FL - Our Local Coverage Area
We’re based in the Miami Springs area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Home Additions & ADU in Miami Springs
A home addition in Miami Springs typically costs between $53,100 and $153,400, depending on the size of the addition, whether it’s a single-story bump-out or a second story, and how much of the existing electrical and roof systems need upgrading to meet current Miami-Dade HVHZ code. Call (877) 610-1318 and we’ll give you a written line-item estimate for your specific house.
Yes, we pull permits and coordinate FAA Part 77 airspace review on every eligible Miami Springs project. The permit inspector works for you, not for us. If a job in Miami Springs needs an obstruction review before the building department will even accept the application, we handle that paperwork as part of the permit package.
No. Any change to the scope or the allowance arrives as a written change order before the work happens. An allowance that isn’t on paper is a surprise waiting for a date. You’ll approve every number in writing before a single nail moves.
Most garage conversions in Miami Springs run 10 to 16 weeks from the day permits clear to final inspection, though FAA review on taller conversions can add a few weeks to the front end before construction starts. The schedule is laid out in the contract before we begin.
Yes. Every Barrett & Sons project carries the written 90-Day Done Right Promise. If something isn’t done right, Tom comes back and makes it right. One call to (877) 610-1318 is all it takes.
Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Miami Springs and surrounding communities since 1998.







Before
After
Before
After
Before
After