Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Huntington Beach
Kitchen remodeling in Huntington Beach typically runs $14,000 to $45,000 for a full tear-out and rebuild, with smaller projects landing between $9,000 and $20,000. The real variable here isn’t labor. It’s the coastal permit process, lot conditions, and the materials you choose. Barrett & Sons Construction has been doing this work since 1998, and we know exactly what Huntington Beach kitchens demand: marine-grade hardware, coastal-zone design review, and a written scope before anything gets ordered. Call (877) 610-1318 to get your estimate started.
We’re not a franchise dispatching strangers. Tom Barrett and his sons run the crews, and they’re on-site most days in Huntington Beach’s beach cottages, tract homes, and waterfront properties. If you’re planning a remodel from Downtown to Huntington Harbour, you want someone who understands the Coastal Zone rules and the paperwork that comes with them. We do.
Key Takeaways:
- Full kitchen remodels in Huntington Beach run $14,000-$45,000; small remodels run $9,000-$20,000.
- Coastal Zone projects need a Coastal Development Permit, which adds weeks to the schedule.
- Marine-grade hardware is standard practice in Huntington Beach, not an add-on.
- Every price change arrives in writing before work proceeds.
- Free estimates; call (877) 610-1318.
Why Barrett & Sons Construction Is Huntington Beach’s Preferred Kitchen Remodeling Company
Homeowners in Huntington Beach ask around before they sign. We like that. Tom Barrett publishes his name, his address, and his license number, so you can look us up before you commit. We’re not the cheapest bid, and we don’t try to be. We’re the crew that shows up, pulls every permit, and hands you a written change order before anything unexpected goes in writing on the job.
Our Kitchen Remodeling team has worked in every corner of the city, from the 1940s bungalows off Lake Street to the stucco tracts in 92646 and the custom waterfront homes in 92649. That local history matters because a kitchen remodel in Huntington Beach is never just a kitchen remodel. It’s a coastal permit question, it’s a soils check, it’s the salt air eating at your subfloor. We plan for all of it.
Dispatch and scheduling are coordinated from our Los Angeles office, but the crews working your Huntington Beach kitchen live and work in the local area. Calls get answered by a live person, 24/7, because that’s how Tom has run the business since 1998. If something’s not right, you’ll get us on the phone, not a voicemail box.
Our Kitchen Remodeling Services in Huntington Beach
Full Kitchen Remodeling
A full kitchen remodel in Huntington Beach means tearing out the old and building fresh: new layout, new framing, new electrical, new plumbing, new everything. On older beach cottage lots near Downtown, this often involves opening load-bearing walls. That’s where the Coastal Zone rules and hidden oil well casings can bite. We handle the permit path end to end, including Coastal Development Permits and any CalGEM clearances, so you don’t get a stop-work order mid-rough-in.

Cabinets & Countertops
We install KraftMaid cabinetry and Cambria quartz as standard options in Huntington Beach. Not mystery brands off a van. Salt air does real damage to cheap cabinet hardware and laminate edges, so we spec stainless steel hinges and slides, and we seal every cut edge. Cabinet installation alone in Huntington Beach runs $4,000 to $13,000, depending on linear footage and whether you’re refacing or going full new.

Kitchen Island Installation
A kitchen island changes how a Huntington Beach kitchen works, especially in the 1970s stucco tracts where the original footprint closed the cook off from the room. Island installation runs $3,000 to $10,000, including plumbing and electrical if you’re adding a sink or cooktop. If your island changes the exterior envelope at all, we’ll know before we order because we file the Coastal Development Permit first. You don’t want to learn about the Coastal Commission after the cabinets arrive.

Backsplash, Tile & Flooring
Backsplash installation runs $800 to $2,500 in Huntington Beach, and tile work goes up from there depending on square footage. Coastal moisture means grout sealing and substrate prep aren’t optional, especially in ground-floor kitchens near PCH where the marine layer holds in the walls. We use modified thinset and moisture barriers as standard practice in every coastal-zone home we touch.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Huntington Beach
We carry KraftMaid and Cambria in the kitchen, and when the project extends to hardscape or a new paver driveway off the kitchen, we work with Techo-Bloc and Cambridge Pavers. These are brands you can look up, with published specs and real warranties. For Huntington Beach customers, that matters because cheap fasteners and low-grade finishes fail fast in salt air. We’d rather install the right thing once than come back to fix the wrong thing twice. The 90-Day Done Right Promise is written on every contract, but the materials we choose are meant to outlast the promise by decades.
Common Kitchen Remodeling Problems We See in Huntington Beach Homes
- Coastal Development Permit surprises: Any kitchen remodel that moves walls or changes the exterior envelope within the Coastal Zone needs a Coastal Development Permit from the California Coastal Commission. Inland Orange County cities don’t face this, and contractors who don’t know Huntington Beach’s rules can leave you with a permit stop and a stalled job. We file permits first.
- Abandoned oil well casings: Portions of the city sit over a century-old oil extraction grid. Excavation near Newland Street, Gothard Street, or the inland flats can turn up abandoned well casings that trigger CalGEM remediation before a load-bearing wall moves. A soils check on the front end prevents a surprise on demo day.
- Salt-driven corrosion: The persistent onshore wind and marine air accelerate rust on ferrous fasteners, flashing, and structural connectors, even inland. Standard galvanized hardware shows rust streaks within two years. We spec stainless steel or hot-dipped galvanized as baseline, not as an upcharge.
- Rotted subfloors under older kitchens: 1940s and 1960s beach cottages near the Lake Street corridor often hide decades of moisture damage under the original flooring. We open a wall or floor and find the subfloor is shot. Marine-grade plywood and proper moisture barriers go back in, not whatever’s on sale at the lumberyard.
Pricing for Kitchen Remodeling in Huntington Beach, CA
Here are the ranges we quote in Huntington Beach, and these hold for the market as we see it in 2026:
- Kitchen Remodel: $14,000-$45,000
- Small Kitchen Remodel: $9,000-$20,000
- Cabinet Installation: $4,000-$13,000
- Countertop Installation: $2,000-$6,500
- Backsplash Installation: $800-$2,500
- Kitchen Island Installation: $3,000-$10,000
On a high-end kitchen in Huntington Beach, the long-lead items set the calendar, not labor. Cambria quartz slabs, custom millwork, and architectural glass have factory lead times that can run weeks. We fix the price in writing before we order those materials. That way, if the stone costs more than expected, that’s our issue to resolve, not a surprise invoice at the end. If the plan changes and the scope grows, you get a written change order before anything is purchased or cut. The allowance that isn’t on paper is a surprise waiting for a date. Call (877) 610-1318 for a free estimate with line-item pricing, and we’ll walk you through exactly what a Huntington Beach kitchen remodel will cost on your specific lot.
We Also Serve Cities Near Huntington Beach
While this page is focused on Kitchen Remodeling in Huntington Beach, our crews work throughout the surrounding coastal plain. We regularly serve Midway City, Fountain Valley, Westminster, and Costa Mesa, all within a short drive of the Huntington Beach coastal zone. If you’re just outside the city line, give us a call and we’ll be honest about timing and whether your project falls under the same coastal rules.
One more thing worth knowing about us. In Huntington Beach’s higher-end kitchens, we coordinate directly with your designer or architect. Custom millwork, specialty finishes, and architectural glass need someone who can read drawings and hold a line item at the same time. We can, and we do.
A note on the Huntington Beach market specifically: construction in certain parts of town, particularly near PCH where FEMA flood maps come into play, may require finished-floor elevation minimums. If your kitchen remodel includes new foundation work or an addition on a lower-lying lot, this will affect your design and your permit. We’ll tell you this on the first visit, not the third.
Serving Huntington Beach, CA - Our Local Coverage Area
We’re based in the Huntington Beach area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Kitchen Remodeling in Huntington Beach
No, replacing cabinets alone, without moving walls or changing the building envelope, generally does not trigger a Coastal Development Permit in Huntington Beach. But if your cabinet swap involves moving plumbing, electrical, or opening load-bearing walls, the permit picture changes, and if you’re in the Coastal Zone, the Coastal Commission may need to review the plans. Call (877) 610-1318 and describe your project; we’ll tell you what permits apply before you buy a single cabinet.
If your kitchen remodel involves excavation near Newland Street, Gothard Street, or the inland flats, there’s a real chance you’re over an old oil extraction corridor. Hitting an abandoned well casing during excavation triggers CalGEM remediation requirements, which can stop the job and add weeks. We run a soils check and review historical well maps before we open the floor in those areas. It’s cheap insurance against a very expensive surprise.
Because lead times on KraftMaid cabinets and Cambria quartz can run four to eight weeks, and material prices shift. If the price changes after we order, we don’t pass that change to you unless you ask for a scope upgrade, and even then, you’ll see a written change order before anything happens. The price on the contract is the price you pay. Call (877) 610-1318 for a line-item estimate; it’s free.
Yes, and we coordinate the permitting and construction schedule with marine contractors when a bulkhead or dock piling needs work at the same time. A waterfront kitchen remodel in Huntington Harbour often exposes timber bulkheads or piling issues behind the home. We don’t ignore those. We bring in a licensed marine subcontractor and fold that scope into one written plan, so the kitchen and the waterfront work aren’t fighting each other on the schedule.
A full kitchen remodel in Huntington Beach with a Coastal Development Permit typically takes four to seven months from signed contract to final inspection. The Coastal Commission review alone can add four to eight weeks, and that comes before framing starts. If the scope stays fixed and the materials are ordered early, we hold the schedule. If the scope changes, we document it and adjust the date in writing. Call (877) 610-1318 and we’ll map your timeline based on your specific ZIP and Coastal Zone status.
Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Huntington Beach since 1998.







Before
After
Before
After
Before
After