Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Pelican Bay
A home addition or ADU in Pelican Bay typically runs between $45,000 and $130,000 for a room addition, while a full detached ADU starts around $90,000 and can reach $220,000 depending on scope. The project will require two separate approvals: one from Collier County and one from the Pelican Bay Foundation’s Architectural Review Committee. Most homeowners wait until both are in hand before we order a single board of lumber. Call (877) 610-1318 if you’re weighing whether to add on or move, and we’ll talk through what’s realistic for your lot.
We’re Barrett & Sons Construction, and we’ve spent nearly three decades in Florida’s high-end coastal communities. Around Pelican Bay, that means knowing how the Foundation’s submittal calendar works, which window specs survive a direct Gulf summer, and which foundation details the county will sign without a second look. Tom Barrett owns the company, his sons run the crews, and a live person answers the phone when you call.
Why Barrett & Sons Construction Is Pelican Bay’s Preferred Home Additions & ADU Company
Tom Barrett has been putting his name on construction jobs since 1998, and around a place like Pelican Bay, that actually means something. The Pelican Bay Foundation keeps a tight rein on what gets built here, and they’re quicker to approve a submittal that shows a contractor who’s been through their process before. We have. We know the ARC meets on its own calendar, not yours, and we know how to get informal staff feedback before finalizing documents so you aren’t sitting through a second review cycle because of a window trim detail nobody caught.
The permit inspector works for you, not for me. That’s why I like him. We pull permits on every eligible job in Pelican Bay, and we treat the Foundation’s review as a parallel track rather than an afterthought. Local homeowners have told us about other contractors who treated the Foundation’s rules as a surprise to be discovered later. We don’t work that way. Every scope item, every allowance, and every price change arrives as a written change order before work happens. An allowance that isn’t on paper is a surprise waiting for a date.
Our Home Additions & ADU team includes Tom’s sons and crew members who carry the Barrett & Sons name. They’re background-checked, uniformed, and on-site most days. For Pelican Bay homeowners, that matters because the crew that frames your addition is the same crew Tom will send back if anything isn’t right. We back every job with the 90-Day Done Right Promise, written on the contract, not buried in fine print. One call brings Tom back.
Our Home Additions & ADU Services in Pelican Bay
ADU Design & Permitting
Designing an ADU in Pelican Bay means starting with the Foundation, not the building department. Their pre-approved material palette sets the visual tone, and their submittal calendar dictates when your project gets heard. We’ve shepherded projects through both tracks enough to know that getting informal staff feedback before finalizing design documents saves a full review cycle. On the county side, units near the Gulf-facing corridor sit in FEMA V-zone or AE flood designations, which means elevated foundations and flood-resistant assemblies are non-negotiable. We design for those constraints from day one, not as a correction later.

Garage Conversion ADU
Converting a garage in Pelican Bay works best on the larger inland estate lots where the original structure was overbuilt by 1980s and 1990s custom-home standards. You’re not fighting the condo tower limitations that govern the high-rises along the western corridor. A garage conversion here typically runs $30,000 to $80,000, and the Foundation will want to see how the new living space interacts with the street elevation. We pull permits, handle the ARC submittal, and install impact-rated windows that meet code and the Foundation’s aesthetic standards.

New Detached ADU
A new detached ADU on a Pelican Bay lot is a serious undertaking, usually $90,000 to $220,000 by the time you account for foundation work, hurricane-rated envelope systems, and Foundation-approved exterior finishes. The sandy soils and high water table near the coast demand careful drainage and structural design that looks nothing like what works inland in Collier County. We spec stainless or hot-dipped galvanized connectors even on interior framing near the Gulf because salt-laden air eats unprotected metal faster than most people expect. Brands like PGT and CGI show up in our window and door packages because they’re built for exactly this environment.

Junior ADU & Interior Conversion
A junior ADU carved out of existing square footage is often the most practical path for Pelican Bay owners who want rental income or multi-generational space without expanding the footprint. The Foundation tends to view interior-only work more favorably, and the county permit path is shorter when you’re not pushing a new foundation into the ground. Still, every eligible job gets permits and inspections. We’ve done enough of these in Pelican Bay to know where the load-bearing points are in the 1980s-era homes, which helps us frame the plan accurately the first time.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Pelican Bay
We put premium brands into Pelican Bay projects because the environment doesn’t forgive cheap materials. For impact-rated windows and doors on additions and ADUs, we install PGT, CGI, and Simonton products, all built for South Florida wind loads and salt exposure. These are materials you can look up and verify, not mystery brands off a van. When we run into an existing window or door from one of these manufacturers that needs service or replacement during your project, we know the product lines well enough to match models and hardware without guesswork.
Common Home Additions & ADU Problems We See in Pelican Bay Homes
- Salt corrosion on connectors and fasteners. Direct Gulf exposure sends salt-laden air deep into framing cavities. We spec stainless or hot-dipped galvanized hardware on every job, even interior work near the beachfront corridor, because replacement 15 years in is far more expensive than doing it right now.
- Foundation movement in sandy, low-bearing soils. Pelican Bay’s inland lots sit on sand that shifts with summer downpours and standing water. We design footers and drainage for that reality, which is different from what works just a few miles inland in Naples.
- ARC submittal rejections over material choices. The Pelican Bay Foundation maintains a pre-approved palette, and contractors unfamiliar with it lose weeks waiting for denial letters. We get informal staff feedback before finalizing documents so your project doesn’t stall before it starts.
- Post-Ian code upgrades catching homeowners off guard. Since Hurricane Ian in 2022, Collier County and the Foundation have tightened requirements for impact-rated openings, elevated mechanicals, and flood-resistant assemblies. Some older Pelican Bay homes were built to standards that wouldn’t pass today. We flag those items in the estimate so there are no surprises at inspection.
Pricing for Home Additions & ADU in Pelican Bay, FL
A single room addition in Pelican Bay runs $45,000 to $130,000. A new detached ADU starts around $90,000 and tops out near $220,000 for a fully finished unit with impact glass and upgraded fixtures. Garage conversions sit between $30,000 and $80,000 depending on how much structural work the existing slab and walls need. Junior ADUs and interior conversions fall on the lower end, often $45,000 to $90,000, because you’re not adding foundation or roofline. What drives the spread here is Foundation compliance, flood-zone elevation requirements on the western corridor, and how much of the existing structure was built to pre-Ian standards. We give written line-item quotes with every allowance spelled out, and price changes arrive as a written change order before work proceeds. You’ll know what the job costs before it starts, not after. Call (877) 610-1318 and we’ll walk your specific lot and give you a real number.
We Also Serve Cities Near Pelican Bay
Most of our work is in Pelican Bay proper, but we regularly take on additions and ADU projects in Naples Park, Naples, Golden Gate, and East Naples. If you’re just outside the Foundation’s boundaries, the permit path is different, and so are the elevations. We know the differences. And if your Pelican Bay addition ends up touching a kitchen or bath, our Kitchen Remodeling in Pelican Bay team handles the cabinetry, counters, and fixtures in the same scope. For ADUs with full baths, our Bathroom Remodeling in Pelican Bay crew manages showers, vanities, and tile as part of the same permit package. No need to coordinate two contractors.
Serving Pelican Bay, FL - Our Local Coverage Area
We’re based in the Pelican Bay area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Home Additions & ADU in Pelican Bay
The Foundation’s Architectural Review Committee typically takes 30 to 60 days for a standard single-family addition submittal, but the clock doesn’t start until your documents are complete and match their pre-approved palette. Contractors who skip the informal staff review often wait twice as long because they get a denial letter and restart the cycle. We handle both the Foundation submittal and the Collier County permit in parallel, which usually trims weeks off the total schedule. Call (877) 610-1318 and we’ll lay out a realistic timeline for your specific project.
You don’t need to hire an architect separately. We work with licensed designers who know Pelican Bay’s Foundation requirements, and our Home Additions & ADU team coordinates the full design and permit package for you, from first sketch to signed inspections. That single point of accountability matters when you’re juggling a county permit, a Foundation review, and a contractor. Get your free estimate by calling (877) 610-1318.
Expect to pay roughly $300 to $450 per square foot for a finished detached ADU in Pelican Bay, with the higher end applying to lots in flood zones that require elevated foundations and impact-rated openings throughout. The sandy soils along the Gulf-facing corridor also add structural cost compared to inland Collier County sites. We write every line item into a fixed quote before work starts, and any change arrives as a written change order. Call (877) 610-1318 for a detailed breakdown for your lot.
Not without your signature. Every scope item, allowance, and price change at Barrett & Sons arrives as a written change order before any work happens. If we discover rotted framing or a Foundation-required material upgrade mid-project, you’ll see the number in writing and approve it before a hammer moves. The allowance that isn’t on paper is a surprise waiting for a date, and we don’t do surprises. Get a written quote by calling (877) 610-1318.
Yes. Every addition and ADU we build in Pelican Bay carries the 90-Day Done Right Promise, written on the contract. If anything isn’t right within 90 days of completion, one call brings Tom Barrett back to make it right. No fine print, no claim department. Call (877) 610-1318 to schedule your free estimate.
Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Pelican Bay since 1998.







Before
After
Before
After
Before
After