Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Marina del Rey
A full home addition or ADU in Marina del Rey typically runs $45,000 to $130,000, and the bigger variable isn’t square footage. It’s what sits under your building. Marina del Rey was built almost entirely on artificially filled former tidal wetlands and marshland after the harbor opened in 1965, which puts nearly every parcel inside state-mapped liquefaction hazard zones. That means ground-up construction and structural additions routinely require deep pile foundations or geotechnical studies that a contractor working in Culver City would never assume. If you’re planning a room addition anywhere in the 90292 or 90295 zip codes, call (877) 610-1318 and we’ll walk you through what your specific parcel actually needs before you spend a dime on plans.
Why Barrett & Sons Construction Is Marina del Rey’s Preferred Home Additions & ADU Company
Tom Barrett put his name on this company in 1998, and his sons run the crews that show up in Marina del Rey. We’re not a franchise dispatching strangers from a call center. When we quote a detached ADU on a parcel near Admiralty Way or a second-story addition off Mindanao Way, the man who signs the contract is the man who answers when you call about the change order. Our crews know that Marina del Rey is unincorporated Los Angeles County, which means permits run through LA County DPW, not City of LA. And because the entire community sits inside the California Coastal Zone, structural work also requires a California Coastal Commission Coastal Development Permit. That dual permitting layer catches out-of-area contractors on a regular basis. We’ve walked projects through both agencies enough times to know the sequence, the wait times, and the questions inspectors will ask before they ask them. So we plan for it from day one.
Ask anyone on your street, or look up the license number yourself. Tom publishes his name, his address, and his license number. Every scope, every allowance, every price change arrives as a written change order before work happens. And every finished job carries the written 90-Day Done Right Promise: if it’s not done right, one call brings Tom back. Our Home Additions & ADU team approaches every Marina del Rey project that way.
Our Home Additions & ADU Services in Marina del Rey
ADU Design & Permitting
In Marina del Rey, an ADU permit isn’t just a city filing. Depending on the parcel, you’re looking at LA County DPW review plus a Coastal Development Permit from the California Coastal Commission. We handle both. Our team drafts the plans, runs the geotechnical evaluation when the soil report demands it, and walks the permit through every agency with your lease terms in hand. A surprising number of Marina del Rey parcels sit on LA County ground leases rather than fee-simple land. Before any structural improvement, we verify lease terms and get county lessor sign-off. That’s a title step most builders in Venice or Mar Vista never think about, and it’s one reason our ADU projects in Marina del Rey move without surprise stoppages.

Garage Conversion ADU
A garage conversion ADU in Marina del Rey generally runs $30,000 to $80,000. The structure’s already there, but the soil underneath isn’t going anywhere. Because so much of the community sits on filled marshland, even conversions can trigger a geotechnical review when you’re adding plumbing or electrical that wasn’t part of the original garage footprint. We’ve done enough of these in the 90292 zip code to know when the county will ask for a soils report and when it won’t. We also account for the marine layer’s effect on embedded metal, so your anchor bolts and connectors get upgraded where chloride corrosion from salt air has done its work over the decades.

New Detached ADU
Expect a new detached ADU in Marina del Rey to land between $90,000 and $220,000. That range is wider here than in Hawthorne or Lawndale for one reason: foundation work. On filled tidal marsh inside a liquefaction hazard zone, a freestanding structure may need deep pile foundations. Some parcels handle a standard slab with over-excavation and compaction. Others need helical piles driven to refusal. The only way to know is a geotechnical study, and we include that in our proposal up front, in writing. No allowance that isn’t on paper. We also spec epoxy-coated or stainless-steel fasteners for any structural connection exposed to Marina del Rey’s persistent salt air. It costs a little more. It lasts a lot longer.

Junior ADU & Interior Conversion
A junior ADU carved out of an existing floor plan is often the most cost-conscious path in Marina del Rey, and because you’re working inside the existing envelope, the foundation and coastal permit burden is usually smaller. The price typically starts toward the lower end of the $45,000 to $130,000 range, depending on whether you’re adding a kitchenette and what the existing plumbing stack can handle. What catches people is the 40-to-60-year-old building stock. Most Marina del Rey condominium buildings went up between 1965 and 1985, and cutting into walls in a mid-rise concrete-frame structure requires knowing where the post-tension cables are. We locate and map them before any saw touches concrete. It’s a step that protects your neighbors, your HOA, and your deposit.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Marina del Rey
When a Marina del Rey addition calls for new windows, we install Simonton and Ply Gem frames. When the project includes doors or glazing near salt-exposed elevations, we often recommend PGT for its coastal-rated construction. These are brands you can look up, not mystery units off a van. We keep common components available for Marina del Rey customers, and because our crews carry the Barrett & Sons name, every material install comes with the same 90-Day Done Right Promise as the framing underneath it. If you’re already planning a kitchen or bath change as part of your addition, we handle Kitchen Remodeling in Marina del Rey and Bathroom Remodeling in Marina del Rey as part of the same scope, with the same written change orders.
Common Home Additions & ADU Problems We See in Marina del Rey Homes
- Liquefaction-zone foundation surprises. Because Marina del Rey was built on filled former tidal wetlands after the harbor opened, a standard slab that works in Culver City may not clear a soils review here. We run the geotech study before we draw the foundation, not after the permit gets kicked back.
- Coastal Commission permitting delays. Marina del Rey sits entirely within the California Coastal Zone, so structural work needs a Coastal Development Permit on top of LA County DPW approval. Contractors unfamiliar with the dual layer regularly blow their schedules by months. We sequence both reviews from day one.
- Ground-lease sign-off issues. A large share of parcels in Marina del Rey sit on LA County ground leases, not fee-simple land. Before any addition or ADU, the lease terms must be verified and the county lessor must sign off. Skip this and your permit stalls before framing begins.
- Salt-air corrosion in 40-to-60-year-old buildings. The persistent marine layer and direct Pacific exposure accelerate chloride-driven corrosion of embedded rebar, metal connectors, and aluminum framing. We swap in epoxy-coated or stainless-steel fasteners wherever the existing metal has started to spall.
Pricing for Home Additions & ADU in Marina del Rey, CA
A full home addition in Marina del Rey runs $45,000 to $130,000, while a new detached ADU lands between $90,000 and $220,000 and a garage conversion typically runs $30,000 to $80,000. What moves the number isn’t just square footage. In Marina del Rey, the foundation strategy is the single largest variable. Parcels on filled marshland inside liquefaction hazard zones may need deep piles, which shifts the structural budget considerably. Salt-air exposure pushes fastener and trim upgrades. The dual county-and-coastal permitting layer adds review time. We give you a written line-item proposal up front, and every change after that arrives as a written change order before the work happens. Call (877) 610-1318 for an exact quote. Estimates are free, and there’s no trip charge inside the county.
We Also Serve Cities Near Marina del Rey
If you’re just outside the 90292 or 90295 zip codes, our crews regularly work in Lawndale, Hermosa Beach, Redondo Beach, and Hawthorne. The coastal permitting picture changes the moment you cross into an incorporated city, and we know those differences because we work them every week. Wherever your parcel sits, the same Home Additions & ADU in Marina del Rey team brings the same written change orders, the same name on the truck, and the same 90-Day Done Right Promise.
Serving Marina del Rey, CA - Our Local Coverage Area
We’re based in the Marina del Rey area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Home Additions & ADU in Marina del Rey
We can usually begin design and geotechnical review within two to four weeks of your signed proposal for a Marina del Rey project. The county and Coastal Commission review rounds take whatever they take, but starting the foundation study early is what keeps your schedule from slipping. Call (877) 610-1318 and we’ll give you a written sequence with real dates.
Yes. We work across the 90292 and 90295 zip codes, including parcels near Admiralty Way, Mindanao Way, and throughout the marina-side condominium districts. Because so much of Marina del Rey is unincorporated county land, we run every project through the same LA County DPW and Coastal Commission sequence regardless of neighborhood.
Marina del Rey tends to land at the higher end of Southern California ADU pricing because of liquefaction-zone foundation work, the dual permit layer, and ground-lease verification. A detached ADU here runs $90,000 to $220,000, while the same structural scope in a fee-simple incorporated city might start lower. Call (877) 610-1318 for a written line-item proposal on your parcel.
Not without your signature on a written change order. Every scope, every allowance, every unexpected condition arrives on paper before a single nail moves. An allowance that isn’t on paper is a surprise waiting for a date. That’s how we’ve priced work since 1998, and it’s how we price every Marina del Rey addition and ADU today.
Every completed addition and ADU carries the 90-Day Done Right Promise, written into the contract. If something isn’t done right, one call brings Tom Barrett back to your Marina del Rey home to make it right. No fine print, no service-department phone tree. Call (877) 610-1318 to schedule your free estimate.
Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Marina del Rey and surrounding communities.







Before
After
Before
After
Before
After