Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Lomita
Home additions and ADU construction in Lomita typically runs $45,000 to $130,000 for a room addition, and $90,000 to $220,000 for a detached ADU. The number moves based on what’s behind your walls, and in Lomita, what’s behind those walls is usually older than the person swinging the hammer. Our Home Additions & ADU crews know the 90717 housing stock well enough to give you an honest number before we open anything up. Call Tom Barrett at (877) 610-1318 for a free estimate, and we’ll walk your property on a schedule that fits yours.
Why Barrett & Sons Construction Is Lomita’s Preferred Home Additions & ADU Company
We’re the owner-operated crew that shows up when we say we will, and our name is on the truck. Tom Barrett founded this company in 1998, and his sons run the crews that work in Lomita. That means the person who shakes your hand at the estimate is the same person who answers when you call about a question three weeks into the job. No call center, no out-of-state dispatcher, no “we’ll have someone reach out.”
Lomita homeowners deal with a building department that’s small, independent, and runs on its own clock. We’ve pulled permits in Lomita long enough to know the plan check calendar, the inspector’s preferences, and when to push and when to wait. That relationship with city hall saves you weeks on an ADU permit, and it’s not something an out-of-town crew can fake. When your addition passes final inspection, Tom’s 90-Day Done Right Promise is in writing on your contract. One call brings him back. That’s how we’ve kept Lomita customers for 29 years.
Every Lomita job gets written change orders before any scope change touches the work, permits pulled on every eligible project, and a live person answering our phones 24/7. Look up our license number, check our standing with the CSLB, ask anyone on your street. We’d rather you do all three before you sign.
Our Home Additions & ADU Services in Lomita
ADU Design & Permitting
Lomita’s independent building department is not LA County’s. Plan check turnaround here often runs 10 to 12 weeks, not the 6 weeks an unfamiliar contractor might quote. Our Lomita team has direct relationships with city hall, so we know what the plan checker wants to see before we submit: proper lot coverage calculations, setback documentation for your specific zoning, and structural details that won’t get kicked back. We handle the design, the engineering, and the permit package, then manage inspections through sign-off. The permit inspector works for you, not for me, which is exactly why we’d rather build a good relationship with that office than fight it.

Garage Conversion ADU
Most Lomita garages were built between 1945 and 1965, and many have never been touched since. That’s fine until you want to live in one. Our crew opened a 1950s ranch on Eshelman Avenue for a garage conversion ADU and found original single-wall wiring and undersized floor joists that had never been updated. We wrote a change order for the rewire and a load-bearing beam replacement before touching anything, then waited out the marine layer so our new stucco could cure without the fog slowing it down. That’s the difference between a quote that holds and a surprise invoice at the end. In Lomita, garage conversions usually land between $30,000 and $80,000 depending on foundation work, utility upgrades, and whether the existing slab can handle the build.

New Detached ADU
A detached ADU on a small Lomita lot takes planning. Most residential lots in the 90717 ZIP are modest, and access is tight. You’re not just building a unit; you’re managing material staging, foundation excavation, utility trenching, and a crane on the day the framing goes up. We sequence that work so the job doesn’t eat your whole yard for six months. Lomita’s expansive clay soil also matters. Native alluvial soils at the foot of the Palos Verdes Peninsula swell and shrink with winter rain, which is why we bring in a soils report before we pour. Skip that step and you get a cracked foundation before drywall even starts.

Junior ADU & Interior Conversion
For homeowners with an underused room, attached garage bay, or an enclosed patio that never really got finished, a Junior ADU can be a leaner path. These typically convert existing interior space rather than building out, which keeps costs down and avoids some of the site work a detached unit requires. That said, the code upgrades still apply. Opening walls in a 1940s Lomita home means facing original wiring, undersized headers, and occasionally asbestos-containing floor tile. We write allowances into the contract so those discoveries become an approved line item, not an argument at the end.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Lomita
We build with materials you can look up. KraftMaid and Cambria in kitchens, Andersen and Marvin on windows, GAF and CertainTeed on roofs, and Belgard and Techo-Bloc on hardscapes. For ADU and addition work, the finish materials matter, but the structural pieces matter more: engineered lumber, Simpson Strong-Tie connectors, and specified concrete mixes that can handle Lomita’s clay soil. We don’t install mystery brands off the back of a van, and we stock the materials your Lomita job needs locally so we’re not waiting on a truck from out of state when you’re ready to frame.
Common Home Additions & ADU Problems We See in Lomita Homes
- Original single-wall wiring: Homes built in the 1940s to 1960s often have ungrounded wiring that was fine for lamps and radios. It is not fine for a modern kitchen or an ADU with a heat pump and an EV charger. Plan on a service upgrade or a full rewire once walls are open.
- Undersized floor joists and pier-and-beam foundations: Many Lomita bungalows sit on early slab or pier-and-beam foundations sized for the original footprint. Adding a second story without confirming the footings can carry the load is how projects stop mid-framing for an expensive retrofit.
- Marine layer delays on exterior work: Lomita sits roughly four miles from the Pacific, and the marine layer parks overhead through late morning most of the year. That slows stucco curing and concrete finishing. We pad schedules for it, because trying to beat the fog is how you get a cracked finish.
- Salt-laden air corroding fasteners: Coastal humidity accelerates corrosion on exposed metal. If your existing framing connectors are rusted through, they need replacing, and the new ones should be galvanized or stainless. It’s a small detail that adds years to the life of the addition.
Pricing for Home Additions & ADU in Lomita, CA
Here are the ranges we give Lomita homeowners before we walk the property. These are honest market numbers for the 90717 ZIP, not a teaser rate designed to get a signature.
| Project Type | Typical Lomita Range |
|---|---|
| ADU Construction | $90,000 - $220,000 |
| Garage Conversion | $30,000 - $80,000 |
| Home Addition | $45,000 - $130,000 |
| Sunrooms & Enclosed Patios | $45,000 - $130,000 |
What moves the number is what’s behind the walls: wiring age, foundation condition, whether a soils report flags expansive clay, and what the permit requires once you’re committed to opening things up. We write every scope, allowance, and price change in writing before work happens. An allowance that isn’t on paper is a surprise waiting for a date. Call (877) 610-1318 and we’ll give you a written line-item quote, not a ballpark you can’t hold.
We Also Serve Cities Near Lomita
Our crews work throughout the South Bay and the neighboring communities around Lomita. That includes Torrance, Rolling Hills Estates, San Pedro, and West Carson. If you’re in one of those areas and considering a Home Additions & ADU project, the same crew, warranty, and written pricing applies.
Serving Lomita, CA - Our Local Coverage Area
We’re based in the Lomita area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Home Additions & ADU in Lomita
Lomita runs its own building department, separate from LA County and separate from Torrance. Plan check for an ADU in Lomita typically takes 10 to 12 weeks, which is longer than what many contractors quote based on their experience in neighboring cities. Torrance has a larger staff and a different review calendar. If a contractor quotes you a 6-week permit for a Lomita ADU, they have not pulled one here. We build that 10-to-12-week window into our schedule and stay in contact with the plan checker so nothing sits untouched. Call (877) 610-1318 and we’ll walk you through the current Lomita timeline for your specific lot.
Expect the electrical to need work. Most Lomita homes from the 1945 to 1965 era have original single-wall wiring that does not meet current code once the wall is opened. You’ll also likely encounter outdated framing connectors, undersized headers where previous owners cut openings, and potentially asbestos-containing floor tile that requires licensed abatement. We write these as allowances in your contract, with a range, so when the inspector requires an upgrade, it’s already on paper and approved by you before any work happens.
It slows down the cure. Lomita’s marine layer typically sits over the city through late morning, which means exterior concrete and stucco applications need more time between coats, and the finishing window is shorter on any given day. We schedule exterior work knowing the fog will be there, and we don’t rush a finish to hit a date. It’s one more reason our Lomita schedules include padding a less experienced crew would not build in. A cracked stucco wall six months after the job ends is not something Tom lets go.
Yes, but it takes more planning than on a larger lot. Many Lomita lots are modest, with narrow side yards and limited street frontage, which means material staging and foundation excavation have to be sequenced carefully. We typically stage materials off-site and deliver in phases, and we plan the crane day far in advance. The bigger variable is soil. Lomita’s expansive clay at the foot of the Palos Verdes Peninsula requires a soils report, and the foundation design has to account for seasonal movement. Skip that and the first wet winter tests your slab in ways you don’t want to see.
Because the original foundation was rarely sized for two stories. Lomita’s postwar homes were built as single-story bungalows and ranch homes, often on pier-and-beam or thin slab foundations that met 1950s code and nothing more. Adding a second story without confirming the existing footings can carry the load is how a job stops mid-framing when the inspector flags undersized support. We bring a licensed structural engineer in before final drawings are done, not after the framing is up. It’s a cost, but it’s written into the quote, and it’s cheaper than a stop-work order.
Get Your Lomita Home Addition or ADU Started
We’re Home Additions & ADU in Lomita done a different way: owner-operated, permit-pulled, and priced in writing before the first nail moves. Tom Barrett’s name, address, and license number are published and verifiable, and the 90-Day Done Right Promise is written on every contract. Call (877) 610-1318 for your free estimate, and we’ll show you what your old Lomita home can become.
Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Lomita since 1998.







Before
After
Before
After
Before
After