Home Additions & ADU in Koreatown, CA | Barrett & Sons Construction - Barrett & Sons Construction

Home Additions & ADU in Koreatown - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

953+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Fast, Reliable Home Additions & ADU Across Koreatown

Adding square footage to a home in Koreatown is not a simple bolt-on job. A room addition or ADU on a 90005 lot means working around party walls, occupied units, and a building stock that runs heavily to pre-1978 wood-frame construction. In real numbers, a Home Additions & ADU project in Koreatown typically runs $45,000-$130,000 for a room addition and $90,000-$220,000 for a detached ADU, and the schedule is driven more by long-lead materials and seismic sequencing than by how many guys you put on the job. Barrett & Sons Construction has been answering the phone for 29 years, and when you call (877) 610-1318, you reach a live person who knows Koreatown’s buildings, not a call center out of state.

Why Barrett & Sons Construction Is Koreatown’s Preferred Home Additions & ADU Company

Tom Barrett founded this company in 1998, and his sons run the crews. When we work in Koreatown, Tom’s name, address, and license number are published and verifiable before you ever sign a contract. Ask anyone on your street or look up the license number yourself. We are not a franchise dispatching strangers from three counties away.

Koreatown’s housing stock rewards a contractor who has worked the neighborhood’s mid-century stucco walk-ups and Spanish Colonial Revival apartment buildings. We know that a second-story addition near Wilshire and Western often means coordinating with a soft-story retrofit already under city deadline, and that phasing work around tenants who cannot be displaced is not a courtesy. It is the job. Every project we run in Koreatown includes permits pulled and inspections signed, every price change arrives as a written change order before a single nail moves, and every completed job carries our 90-Day Done Right Promise in writing.

Our crew members are background-checked and uniformed on every visit. A live person answers the phone 24 hours a day, 7 days a week. If something is not right, Tom comes back and makes it right, one call.

Our Home Additions & ADU Services in Koreatown

ADU Design & Permitting

Getting an ADU through the City of Los Angeles means plans that reflect Koreatown’s actual conditions: density, lot coverage limits, and the retrofit obligations that attach to older multi-family parcels. We handle the design and the permit package as one scope, so the project does not stall between an architect who drew something pretty and a builder who says it cannot be built for what was quoted. Every allowance that is not on paper is a surprise waiting for a date. We put the allowances in writing before we submit.

Garage Conversion ADU

A garage conversion in Koreatown typically runs $30,000-$80,000, but the number that matters more is whether the garage sits under a tuck-under carport in a soft-story building. If it does, the seismic retrofit sequence affects your garage conversion, and missing that coordination is how you get a stop-work order and double mobilization. We have converted garages on dense blocks near Olympic and Vermont where staging materials meant sequencing deliveries by the hour, not the day. That is not a suburban timeline, and we do not pretend it is.

New Detached ADU

A new detached ADU on a Koreatown lot is a $90,000-$220,000 project, and the honest truth is that the long-lead items set the calendar. Custom millwork, architectural glass, Cambria slabs, Euro-style shower systems. Labor does not drive the schedule on this tier. Materials do. We price those line items in writing before we order anything, which is why our fixed price stays fixed. Our scope of work allocates slab and cabinetry allowances in the draw schedule before the first rough-in, not after a designer realizes the lead time slipped.

Junior ADU & Interior Conversion

A Junior ADU inside an existing Koreatown apartment unit is often the most practical way to add rentable square footage without the structural and sequencing complications of a detached build. Many of these units can be created within an existing bedroom or converted interior space, with a kitchenette, a separate entrance, and the plumbing already run. We coordinate with the building’s existing systems so the work does not disturb the units above and below. For a landlord in a fully occupied 90005 building, that phasing is the difference between a completed JADU and a tenant exodus.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (877) 610-1318

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Koreatown

We install materials you can look up, not mystery brands off a van. In Koreatown ADU and room addition work, that means KraftMaid and Cambria in the kitchen and wet bar, Kohler fixtures in the bath, Andersen windows on the upper-floor expansion, and Belgard or Techo-Bloc on any hardscape tied into the addition. When a Koreatown customer wants a stone product, we quote Techo-Bloc and Cambridge Pavers by name and line item. You know exactly what you are paying for, and the lead time for each product is written into the schedule before we order. That is how a fixed price stays fixed.

Common Home Additions & ADU Problems We See in Koreatown Homes

  • Soft-story retrofit sequencing gone wrong. An owner adds a second-story ADU over a tuck-under carport without coordinating the city-mandated steel moment-frame retrofit, and the inspector shuts the job down. We price the seismic scope into the addition from day one because in Koreatown, the two are inseparable.
  • Long-lead allowances that were never written down. Custom millwork and architectural glass have real lead times, and slab overruns are foreseeable from the design phase. Yet we routinely see owners handed change orders for cabinet and countertop costs that should have been in the original scope.
  • Party-wall access and tenant dust control ignored. In Koreatown’s fully occupied walk-ups, you cannot demo a shared wall at noon and expect the building to stay livable. Phased access, negative air pressure, and scheduled rough-ins around tenant hours are the baseline, not the upgrade.
  • Suburban timelines applied to a dense-block build. Koreatown’s 2-to-4-story buildings on some of the densest residential blocks in the United States mean material staging, dumpster placement, and crane or lift access all need advance sequencing. A contractor who treats a 90005 lot like a Hancock Park single-family parcel will blow the schedule.

Pricing for Home Additions & ADU in Koreatown, CA

A room addition in Koreatown runs $45,000-$130,000. A new detached ADU runs $90,000-$220,000, and a garage conversion runs $30,000-$80,000. The spread comes down to scope: a Junior ADU inside an existing unit lands on the lower end, a second-story addition with architectural glass and custom cabinetry on the higher end. Below are the line items we quote most often in 90005.

Scope Koreatown Price Range
ADU Construction $90,000-$220,000
Home Addition $45,000-$130,000
Garage Conversion $30,000-$80,000
Kitchen Remodel $14,000-$45,000
Bathroom Remodel $9,000-$28,000
Countertop Installation $2,000-$6,500
Cabinet Installation $4,000-$13,000

We give you a written, line-item estimate before any work begins. When a price changes, it changes on paper first, with your signature, before we order or install anything. That is the whole point of a fixed price. Call (877) 610-1318 and we will schedule the free estimate.

We Also Serve Cities Near Koreatown

Our crews work throughout the surrounding area: Los Angeles, Echo Park, Silver Lake, and Hollywood. If you own a building in Koreatown and an investment property one neighborhood over, you get the same written scopes, permits pulled, and 90-Day Done Right Promise on both. One contractor, one name to call, one paper trail.

Serving Koreatown, CA - Our Local Coverage Area

We’re based in the Koreatown area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Home Additions & ADU in Koreatown

Does LA’s soft-story retrofit ordinance affect my ADU project if my Koreatown building is already compliant?

No, if your building has already received its soft-story retrofit sign-off under Ordinance 183893, that compliance does not add new structural work to your ADU scope, but it does change how we sequence the job. We can start the addition without phasing around a retrofit deadline, which shortens mobilization and lets us schedule demolition uninterrupted. If compliance is pending, we coordinate the two scopes from the first day, because adding an ADU over a tuck-under carport in a building that is not yet compliant will trigger a stop-work order. Call (877) 610-1318 and we will check your building’s retrofit status when we come out for the estimate.

How do you handle dust and noise when adding an ADU to an occupied Koreatown apartment building?

We phase the work. Demolition and rough-in get confined to defined hours, negative air pressure and zip-wall containment isolate the occupied units, and material staging is scheduled around tenant access rather than the other way around. In Koreatown’s fully occupied walk-ups, that is not a courtesy, it is a requirement. We put the dust-control and access plan in the written scope before we start, so tenants and owners both know what to expect.

What long-lead items actually drive the schedule for a high-end ADU in 90005?

Custom cabinetry, architectural glass, stone slabs, and specialty plumbing fixtures drive the schedule, not labor. A Cambria slab order or a KraftMaid custom cabinet run can take eight to twelve weeks, and if those allowances are not ordered at the start of the design phase, the whole project stalls mid-rough-in. We price every long-lead item into the draw schedule before the first nail moves, which is how our inspections sign off on time and the price stays what we quoted.

Can I build a Junior ADU inside my existing Koreatown apartment unit without major structural work?

Often, yes. A Junior ADU inside an existing unit can be created by converting interior space, adding a kitchenette and a separate entrance, without new foundation or structural changes, provided the building has the plumbing and electrical capacity. The work runs through the existing systems, so the surrounding units stay undisturbed. We will confirm what your specific building allows and bring the permit package in one scope.

Why is a fixed price in writing so important for a Koreatown room addition?

Because Koreatown’s soft-story retrofit queue, party-wall density, and occupied-building phasing introduce moving pieces that a vague estimate cannot account for. An allowance that is not on paper is a surprise waiting for a date. When Tom Barrett scopes a room addition, every allowance, every change order, and every long-lead item is written down and signed before work proceeds. If something changes mid-job, you see the number in writing before we act. That is how a five-figure project ends with the price you agreed to, not the price a national outfit would “discover” at the end. Call (877) 610-1318 for an exact quote, estimates are free.


Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Koreatown since 1998.

Why Los Angeles Chooses Barrett & Sons Construction

We set the standard for construction in Los Angeles.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Los Angeles

Getting your construction handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your construction needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Los Angeles - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Los Angeles Customers Say

Trusted by homeowners across Los Angeles and surrounding areas.

★★★★★

"Genuinely good builders and I would use them again. Site tidiness slipped a bit in the middle stretch and I had to mention it, after which it was spotless every evening."

Marcus Threadgill · Verified customer
★★★★★

"Every change to the price came as a written change order before the work happened, not as a surprise on the final bill. I did not know contractors still did that."

Xiomara Benavides · Verified customer
★★★★★

"Tom Barrett was on our job most days himself, not just at the quote and then never again. When something needed deciding there was an actual person to decide it with."

Rosalie Pemberton · Verified customer

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Dec 31, 2026
$40

$40 Off Any Repair Over $200

Expires Dec 31, 2026
Free

Free Second Opinion on Any Written Estimate

Expires Dec 31, 2026
Free

No Trip Charge Inside Our Own County

Expires Dec 31, 2026
10%

Senior & Veteran 10% - Always

Expires Dec 31, 2026

Ready for Construction in Los Angeles?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Los Angeles.

(877) 610-1318

Request a Free Estimate in Los Angeles

Tell us about your construction needs - we'll respond within the hour.

By requesting your free estimate, you accept our Privacy Policy and consent to receive communications through phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Us
Areas We Serve
Call Now - 24/7 Dispatch