Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Altadena
Rebuilding a home in Altadena means adding space that meets LA County’s Wildland-Urban Interface code, survives Santa Ana wind seasons, and sits properly on alluvial-fan soil. That’s more than a room addition; it’s geotechnical work, fire-resistant engineering, and a permit path through the County, not a city hall. If you’re planning a detached ADU, a garage conversion, or a second-story addition in 91001 or 91003, call Barrett & Sons at (877) 610-1318. We walk every Altadena job from first soil test to final inspection, and our crews know the burn-zone rebuild process because they’re working in it every week.
Why Barrett & Sons Construction Is Altadena’s Preferred Home Additions & ADU Company
Tom Barrett puts his name, address, and license number on every contract. In Altadena, where homeowners are already dealing with insurers, FEMA paperwork, and LA County permitting, that transparency matters. You’ll see Tom or one of his sons on-site, not a rotating cast of subcontractors. The permit inspector works for you, not for us. We like it that way.
Altadena homeowners tell us the same thing: they got burned once by a contractor who quoted low and billed high. So every scope, every allowance, every change order from our Home Additions & ADU team arrives in writing before work begins. The allowance that isn’t on paper is a surprise waiting for a date. We don’t do surprises. We do written line items and a 90-Day Done Right Promise on every completed job.
Calls are answered by a live person 24/7. Not a voicemail box. Not an out-of-state call center. When a retaining wall shifts during a post-fire mudslide season or a foundation question comes up mid-pour, you’ll speak to someone who can actually help.
Our Home Additions & ADU Services in Altadena
ADU Design & Permitting
An ADU in Altadena triggers two permit tracks at once: standard residential building review plus WUI fire-safety review through LA County Department of Public Works. We handle both. Our Home Additions & ADU in Altadena work includes full plan sets, structural engineering, Title 24 energy calcs, and the fire-hardening details (ember-resistant vents, tempered glass on the fire-facing side, ignition-resistant siding) that the County now requires for any new dwelling unit in the Very High Fire Hazard Severity Zone.

Garage Conversion ADU
Many pre-fire Altadena garages were detached, wood-framed, and built between 1925 and 1960. Converting one means first checking whether the slab and footings survived the fire or whether water-saturated soil compromised them. We see cracked slabs and shifted footings on alluvial-fan ground more often than anyone would hope. The good news: a garage conversion in Altadena typically runs far less than new detached construction, and we handle the structural retrofit, insulation, electrical, and full finish-out as one contract.

New Detached ADU
New construction in the burn zone means soil contamination testing before a single concrete bucket pours. Ash and burned building material leach heavy metals and VOCs into the top layers of soil, and LA County requires documentation before foundation approval. We coordinate that testing, the geotechnical report, and the foundation design as one package. Then we build to current WUI standards, which add roughly 8-15% to materials cost compared to a pre-fire build, but deliver a unit that’s significantly more fire-resistant than what stood there before.

Junior ADU & Interior Conversion
For homeowners who want rental income or multigenerational space without a full detached build, a Junior ADU tucked into an existing home’s footprint is often the fastest permit path. In 91001, where many surviving homes are mid-century ranch-style with generous floor plans, a JADU can convert a den, bonus room, or oversized laundry area into a legal dwelling unit. We handle the separate exterior entrance, efficiency kitchen, and occupancy requirements LA County now enforces post-Eaton.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Altadena
We don’t install mystery materials off a van. For Altadena hardscape and site-prep work tied to ADU foundations, driveways, and patios, we use Belgard, Techo-Bloc, and Cambridge Pavers - brands with published specs you can look up before you sign. Footer drains, retaining walls, and access paths need products that hold up to post-fire hydrophobic runoff, and these pavers and blocks are engineered for exactly that kind of load. We stock common lines locally for Altadena jobs, which shortens lead times when a project has to move on schedule.
Common Home Additions & ADU Problems We See in Altadena Homes
- Compromised retaining walls on sloped lots. Fire suppression water saturated alluvial-fan soils, and many older walls shifted or cracked during the following rain season. We frequently re-engineer these before an addition can be permitted.
- Contaminated soil above the burn horizon. Ash from the Eaton Fire leached heavy metals into topsoil. LA County requires testing and, often, removal or capping before new foundations. Skipping this step isn’t an option.
- Outdated footprints that no longer meet WUI or seismic code. A 1940s wood-frame bungalow footprint often can’t be reused as-is. We design additions that meet current fire-hardening and seismic standards without inflating the budget unnecessarily.
- Debris-flow risk on hillside lots. Hydrophobic soils above Altadena’s mountain-front streets create real mudslide danger during winter rains. Site preparation for any addition or ADU above the fire line must include drainage engineering that pre-fire contractors never had to think about.
Pricing for Home Additions & ADU in Altadena, CA
A typical home addition in Altadena runs $45,000-$130,000, depending on the footprint, foundation condition, and whether you’re building up or out. A full detached ADU typically lands between $90,000 and $220,000, while a garage conversion falls closer to $30,000-$80,000. Junior ADUs and interior conversions, depending on plumbing and electrical scope, often fall in the $40,000-$80,000 range. What drives the number in Altadena specifically: soil remediation if contamination is found, retaining wall repair, and WUI-mandated materials like ember-resistant vents and Class A ignition-resistant siding. You’ll get a written, line-item estimate before any work begins, and every change order stays in writing. Call (877) 610-1318 to schedule a free estimate - no trip charge inside the county.
We Also Serve Cities Near Altadena
Our crews work regularly in Pasadena, La Cañada Flintridge, East Pasadena, and San Marino. If you’re weighing an addition alongside a kitchen update, our Kitchen Remodeling in Altadena crew can fold that work into one contract. Likewise, Bathroom Remodeling in Altadena often runs concurrently with an ADU build, and coordinating both trades under one roof saves time and avoids finger-pointing between subcontractors.
Serving Altadena, CA - Our Local Coverage Area
We’re based in the Altadena area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Home Additions & ADU in Altadena
We typically begin the permitting package within two weeks of a signed contract, and the LA County permit timeline for ADUs in Altadena currently runs 4-8 months depending on soil testing results and plan review queue. Call (877) 610-1318 to get a realistic start date for your specific lot, because every burn-zone parcel moves on a slightly different clock.
Yes. We coordinate soil contamination testing through LA County’s required protocol, order the geotechnical report, and fold both into your permit package. You won’t chase down a third-party lab or guess at the next step. When the report comes back clean, we move; when it doesn’t, we handle remediation or capping before the first pour.
Expect to pay about 8-15% more for WUI-required materials in Altadena than you would for a similar ADU in Pasadena. That covers ember-resistant vents, Class A roofing, ignition-resistant siding, and tempered glass on fire-facing elevations. The tradeoff is a unit that’s materially more fire-resistant than the house that stood there before. For an exact number, call (877) 610-1318 - written estimates are free.
Only if the scope changes, and only with a written change order you sign first. No allowances hiding surprises. No end-of-job invoice you didn’t see coming. The price we write down is the price you pay, unless you ask us to change the project, in which case the new number is on paper before a nail moves.
Yes. Every completed job carries our 90-Day Done Right Promise in writing. If something isn’t done right, one call brings Tom back. For workmanship beyond 90 days, material warranties from the manufacturers apply, and we’ll be here to honor them because we live twenty minutes away and plan to stay.
Planning an addition or ADU in Altadena means working with a contractor who understands LA County’s fire-zone codes, post-Eaton soil conditions, and the engineering reality of building against the San Gabriel front. Barrett & Sons Construction has been owner-operated since 1998, and Tom Barrett’s name, address, and license number are on every contract. Call (877) 610-1318 today to schedule your free estimate. We’ll walk the lot with you, talk through what’s actually possible, and put every number in writing.
Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Altadena and surrounding communities.







Before
After
Before
After
Before
After