Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Venice
A full kitchen remodel in Venice, CA typically costs $14,000 to $45,000, with small and partial remodels running $9,000 to $20,000. The single biggest variable isn’t granite versus quartz. It’s whether your contractor understands Venice’s dual-permit reality: a Coastal Development Permit from the California Coastal Commission layered on top of LADBS building permits. Get that wrong and a 10-week kitchen turns into eight months of delays.
Barrett & Sons Construction has worked in Venice long enough to know which remodels trigger CDP review and which ones don’t. Tom Barrett and his sons walk every Venice job before quoting, because the difference between a clean permit path and a stalled one is often visible from the alley. Call (877) 610-1318 and we’ll tell you straight what your kitchen needs, what it costs, and how long the paperwork will actually take.
Why Venice Homeowners Call Barrett & Sons for Kitchen Remodeling
Tom Barrett founded this company in 1998, and his name is on the truck. His sons run the crews. When you call, a live person answers, 24/7. Not a voicemail box and not an out-of-state call center. That matters when you’re three weeks into a remodel and the Coastal Commission asks for a revised window elevation drawing.
We’re not a franchise dispatching strangers to Venice. The crew that shows up on your street had their background checked and they wear the Barrett & Sons name on their uniforms. Most days, Tom or one of his sons is on-site with them. Our reputation in Venice was built one kitchen at a time, and we back every job with a written 90-Day Done Right Promise. If it’s not done right, one call brings Tom back. That promise is on every contract, not buried in fine print.
You can verify all of this before you sign anything. Tom publishes his name, his address, and his license number. Look it up. Ask anyone on your street. We’d rather you did.
Our Kitchen Remodeling Services in Venice
Kitchen Design & Layout
Layout is where Venice kitchens win or lose. The 1920s Craftsman bungalows along the walk streets off Abbot Kinney have small footprints and load-bearing walls that were never meant to move. The newer Silicon Beach teardown-rebuilds have open plans but strict coastal glazing requirements. We design around both. Our Kitchen Remodeling team starts every Venice project by checking the Coastal Zone map, the HPOZ overlay if you’re near the canals, and the existing structural drawings. Then we lay out a kitchen that works for how you cook, not how a showroom thinks you should.

Cabinet Installation & Refacing
Venice eats cabinet hardware. The salt-laden marine air off Santa Monica Bay corrodes standard hinges and drawer slides within two years. We specify stainless or marine-grade hardware on every Venice cabinet job, even when the cabinets themselves are standard. If your existing cabinet boxes are solid and you just want new doors and faces, refacing runs $4,000 to $13,000 in Venice and keeps the demolition to a minimum. That matters when your kitchen is 90 years old and the plaster walls don’t want to be disturbed.

Backsplash, Tile & Flooring
Backsplash installation in Venice runs $800 to $2,500, and tile flooring sits within the overall remodel range depending on square footage and material. We work with a lot of homeowners in the Canal District and along the walk streets who want period-appropriate tile that fits a 1920s bungalow. We also do modern large-format porcelain and natural stone for the newer builds. Whatever you choose, we set tile on substrates rated for Venice’s moisture and movement. Coastal homes shift more than inland homes do, especially the ones on the old marshland fill in western Venice.

Full Kitchen Remodeling
When you’re opening walls, moving plumbing, relocating windows, or changing the exterior footprint, you’re in full remodel territory. In Venice, that’s where the permit conversation gets serious. A kitchen remodel that adds or moves exterior openings, roof vents, or plumbing on a wall facing the beach can take three to six months longer than a contractor’s initial schedule. Not because the work takes longer. Because the California Coastal Commission takes longer. We’ve shepherded dozens of Venice kitchens through CDP review, and we build that timeline into your contract up front so there are no week-12 surprises.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Venice
We install KraftMaid and Cambria in kitchens because they’re brands you can look up, not mystery products off a van. For hardscape touches that often accompany a Venice kitchen remodel, like a small paver patio or a walkway update, we work with Belgard and Techo-Bloc. The materials matter here more than inland. Salt air, persistent moisture, and coastal sun eat cheap finishes fast. We’d rather install something that still looks right in eight years than quote you a number that only works with materials that won’t survive two.
Common Kitchen Remodeling Problems We See in Venice Homes
- The Coastal Zone premium isn’t priced. A contractor quotes $18,000 for a small Venice kitchen but hasn’t priced hand-carry labor, marine-grade hardware, or the three-to-six-month CDP wait. By week two, the schedule’s blown and the contractor’s looking for a way out. We price Venice reality from day one.
- Interior-rated hardware in a salt-air kitchen. Standard hinges, drawer slides, and under-sink plumbing corrode within two years this close to the water. We specify stainless or marine-grade parts on every Venice job, and it’s in the written scope, not an “upgrade” we spring on you later.
- The HPOZ surprise. You move a load-bearing wall or add a window in the Venice Canals Historic District without checking the HPOZ overlay. The city issues a stop-work order, and now you need a Coastal Development Permit after demolition already started. That’s a six-week stall and a re-do of work you already paid for. We check the overlay before we quote.
- Foundation surprises under old bungalows. Much of western Venice was low-lying marshland and sandy fill. When you open a kitchen floor and find settlement issues, the fix isn’t a simple slab. It’s engineered piers or grade beams. If your quote didn’t account for that possibility, the change order will. Ours does.
Pricing for Kitchen Remodeling in Venice, CA
Here’s what we tell Venice homeowners before we ever sign a contract. A full kitchen remodel in Venice runs $14,000 to $45,000. A small kitchen remodel runs $9,000 to $20,000. The range depends on cabinet grade, countertop material, whether you’re moving plumbing or walls, and whether your house is in the Coastal Zone or an HPOZ district. Here’s the line-item breakdown so you can compare quotes honestly:
| Venice Kitchen Remodel Service | Typical Range |
|---|---|
| Full Kitchen Remodeling | $14,000 - $45,000 |
| Small Kitchen Remodel | $9,000 - $20,000 |
| Cabinet Installation | $4,000 - $13,000 |
| Countertop Installation | $2,000 - $6,500 |
| Backsplash Installation | $800 - $2,500 |
Every scope, every allowance, every price change we issue comes as a written change order before work happens. The allowance that isn’t on paper is a surprise waiting for a date. You’ll never open a final invoice from Barrett & Sons and find a number you didn’t approve in writing first. Call (877) 610-1318 for a free estimate, and we’ll walk your Venice kitchen together before we put a single number on paper.
We Also Serve Cities Near Venice
Barrett & Sons runs kitchen remodels throughout the Westside. We work in Venice, Santa Monica, Culver City, Ladera Heights, and Century City. If you’re a few blocks outside the 90291 or 90294 ZIP codes, give us a call anyway. We’re usually not far, and we don’t charge a trip fee inside the county.
Serving Venice, CA - Our Local Coverage Area
We’re based in the Venice area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Kitchen Remodeling in Venice
No. A cabinet-and-countertop-only remodel that doesn’t touch exterior walls, windows, rooflines, or plumbing on exterior walls usually stays within the LADBS building permit process without a Coastal Development Permit. The CDP trigger is structural or exterior work: moving or adding windows, cutting new roof vents, relocating plumbing on a beach-facing wall, or changing the exterior footprint. If your project includes any of those, expect the California Coastal Commission to weigh in, and plan for three to six months of added review time. We’ll tell you during the estimate whether your specific kitchen trips the CDP wire. Call (877) 610-1318 for a straight answer on your house.
A compliant Venice kitchen quote includes marine-grade stainless fasteners on every exterior-hung component like range hoods and vents, waterproofing rated for coastal moisture exposure, engineered foundation work if the house sits on marshland fill, hand-carry labor if you’re on a canal walkway or pedestrian-only walk street, and the three-to-six-month Coastal Commission timeline built into the schedule. A cheap quote leaves all of that out and then change-orders you halfway through. Our quotes include the Venice Coastal Zone premium up front because we’ve done this long enough to know it’s not optional. Call (877) 610-1318 and we’ll show you the difference line by line.
When your kitchen remodel passes final inspection with documented permit sign-offs, including any Coastal Commission conditions, your insurance company has no grounds to dispute a claim on that work. If you alter load-bearing walls or exterior openings without permits and something fails in a storm, the insurer can deny the claim based on unpermitted work. Venice sits in a wind and coastal exposure zone that insurers scrutinize. We pull permits, meet the wind-load ratings, and get the inspector’s sign-off on paper. That paper trail protects you. The permit inspector works for you, not for us. That’s why we like him. Call (877) 610-1318 to talk through what your specific kitchen needs to stay compliant.
It’s possible, but it’s not simple. The Venice Canals Historic District has an HPOZ overlay that restricts what you can alter on the exterior of older structures. A load-bearing wall change on the interior still requires structural engineering and LADBS permits, but if it changes the exterior appearance, the roofline, or window placements, you’ll also need HPOZ review and possibly a Coastal Development Permit. Demolition before those approvals come through gets you a stop-work order fast. We check the HPOZ boundary and the Coastal Zone map before we ever quote a wall removal. Call (877) 610-1318 and we’ll look up your specific address.
Venice sits directly on the coast, and the persistent marine layer plus the salt-laden onshore breeze off Santa Monica Bay accelerates corrosion on metal hardware. Standard interior-rated hinges, drawer slides, and under-sink P-traps that hold up fine in Culver City’s drier inland air will pit and seize within two years in Venice. That’s why we specify stainless or marine-grade fasteners and plumbing parts on every Venice kitchen job, even when the cabinet boxes are standard. It costs a little more up front and saves you a warranty denial and a punch list that never closes. Call (877) 610-1318 for an exact quote on your Venice kitchen.
Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Venice, CA since 1998.
Ready to talk about your Venice kitchen remodel? Call (877) 610-1318 today for your free estimate. No trip charge inside the county, and you’ll get a straight answer on permits, pricing, and timeline before you sign anything.







Before
After
Before
After
Before
After