Home Additions & ADU in Malibu, CA | Barrett & Sons Construction - Barrett & Sons Construction

Home Additions & ADU in Malibu - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

953+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Fast, Reliable Home Additions & ADU Across Malibu

A detached ADU in Malibu typically costs $90,000-$220,000, a garage conversion runs $30,000-$80,000, and a full room addition lands between $45,000-$130,000. Timelines stretch longer here than almost anywhere in LA County because of the Coastal Commission layer, not because the work itself is harder. That’s the honest answer. If you’re weighing bids for an Home Additions & ADU project on a PCH lot or up in the Santa Monica Mountains, call us at (877) 610-1318 and we’ll walk you through what a compliant quote actually includes.

Call (877) 610-1318

We’re Barrett & Sons Construction, and Tom Barrett’s sons run the crews. We work in the 90263, 90264, and 90265 zip codes every month. When a Malibu homeowner calls, a live person answers. When you ask why a Coastal Development Permit adds four to nine months before we even pour, you get a straight answer from someone who’s filed that paperwork for beachfront lots, hillside rebuilds, and everything between.

Why Barrett & Sons Construction Is Malibu’s Preferred Home Additions & ADU Company

Homeowners in Point Dume, Sunset Mesa, and central Malibu keep our number because we don’t quote one thing on the phone and show up with another. Every scope, every allowance, every price change comes as a written change order before work moves. That matters a lot when a Coastal Commission condition forces a foundation redesign midway through permits.

Tom publishes his name, his address, and his license number. Look it up before you sign anything. The permit inspector works for you, not for me. We’ve had Malibu customers tell us their previous contractor said the Coastal Development Permit was optional. It isn’t. We pull permits and get inspections signed on every eligible job, and we don’t frame a single wall until the paperwork says we can.

Crews are background-checked and uniformed. We carry premium brands across every trade: Andersen and Marvin on windows, GAF and CertainTeed on roofs, Belgard and Techo-Bloc on hardscapes. Materials you can look up, not mystery brands off a van. And every job we finish in Malibu is backed by our written 90-Day Done Right Promise: if it’s not right, Tom comes back and makes it right, one call.

Our Home Additions & ADU Services in Malibu

ADU Design & Permitting

This is where Malibu projects win or die. A compliant ADU plan in the coastal zone requires a California Coastal Commission Coastal Development Permit stacked on top of city permits, plus Chapter 7A ignition-resistant construction details on the drawings before LA County fire will sign off. We handle the full permit package: Coastal Commission application, city submittal, fire review, and the revision cycles. Expect this to add months to your timeline. Expect any contractor who skips it to hand your project a stop-work order.

ADU Design & Permitting

Garage Conversion ADU

Converting an existing garage in Malibu is often the fastest path to a rental unit or in-law suite, but the existing structure has to be brought up to current code. Many garages in the 90265 corridor were built before ember-resistant vent requirements existed. We upgrade the assemblies, add the Class A roofing where required, and pull the Coastal Commission permit if your garage sits within the coastal zone. Budget $30,000-$80,000 depending on what the existing slab and framing can support.

Garage Conversion ADU

New Detached ADU

Building new on a Malibu lot means foundations get complicated fast. Beachfront parcels in the 30-40 foot width range often require deep caissons instead of spread footings because the sandy, liquefiable soils won’t hold a conventional slab, and the Coastal Commission limits how much beach area the foundation can occupy. Hillside lots in the Santa Monica Mountains add geotech reports and often fire-road access constraints. A detached ADU here runs $90,000-$220,000 all-in with permits.

New Detached ADU

Junior ADU & Interior Conversion

A JADU inside the existing home footprint is the one ADU type that sometimes moves faster in Malibu, since it triggers fewer Coastal Commission reviews when the exterior envelope doesn’t change. That said, if you’re converting a garage bay or unfinished bonus room, the fire-hardening requirements still apply to any new assemblies. We’ll tell you upfront whether your specific conversion path avoids the full coastal permit cycle or not.

Junior ADU & Interior Conversion
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (877) 610-1318

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Malibu

We stock and install brands that hold up to salt air and fire-weather cycles. For hardscape and paver work on Malibu properties, we regularly use Techo-Bloc and Cambridge Pavers. For concrete and site-prep products, Quikrete and Oldcastle show up on our orders. These aren’t special-order exotics. They’re what we specify because we know how they perform on coastal lots and hillside terrain. If a material won’t survive marine corrosion or a Santa Ana wind event, we won’t put it on your property.

Common Home Additions & ADU Problems We See in Malibu Homes

  • Salt-corroded anchor bolts and connectors. Marine air off the Pacific eats standard steel fasteners fast. On a 35-foot-wide PCH beachfront lot in central Malibu, our crew added a detached ADU where the original slab-on-grade showed salt-corroded anchor bolts. We swapped to hot-dipped galvanized hardware, drove caissons through the sandy subfloor, and scheduled every concrete pour around Caltrans moving-lane closures, with the Coastal Commission permit dictating the exact foundation area before we could even rough-in.
  • Spread-footing quotes that can’t survive sandy soil. A contractor quotes a conventional foundation on a beachfront lot, hits refusal in loose sand, and suddenly the change order eats your allowance while rough-in stalls for weeks while caissons get engineered. We see this on PCH lots all the time. The fix is engineering the foundation correctly the first time, before the bid is signed.
  • Plans missing Chapter 7A fire-hardening details. An ADU plan that omits ember-resistant vents or a Class A roof assembly fails LA County fire inspection sign-off, the permit can’t close, and the insurance claim gets delayed. Nearly all of Malibu sits in a Very High Fire Hazard Severity Zone. The fire code details matter as much as the Coastal Commission details.
  • Staging materials on PCH without a Caltrans encroachment permit. That triggers a stop-work order, leaving a half-framed second story exposed to the next Santa Ana wind event. We coordinate moving-lane closures with Caltrans before materials ever hit the site. It’s a permitting layer almost never encountered inland, and skipping it is a costly mistake.

Pricing for Home Additions & ADU in Malibu, CA

Project Type Malibu Price Range
ADU Construction $90,000-$220,000
Garage Conversion $30,000-$80,000
Home Addition $45,000-$130,000

Those are real bid ranges we’ve written for Malibu projects in the 90263, 90264, and 90265 zip codes. What moves the number is foundation type, the coastal permit path, fire-hardening assemblies, and site access. A hillside lot with a difficult fire-road approach costs more to stage than a flat corner lot off Kanan Dume Road. A detached ADU with caissons on a PCH beachfront parcel will run toward the top of that range. A JADU inside the existing envelope can land lower. Call (877) 610-1318 and we’ll give you a written, line-item estimate. It’s free, and it won’t be a phone number that ghosts you when the Coastal Commission asks for revisions.

We Also Serve Cities Near Malibu

Our crews also cover Home Additions & ADU in Malibu and the neighboring communities of Agoura, Agoura Hills, Westlake Village, and Thousand Oaks. The regulatory landscape changes fast once you cross the county line into Ventura, so we keep our permitting knowledge specific to each jurisdiction. If you’re just over the hill in Agoura Hills or Westlake Village, call us. We know the difference between what Malibu requires and what those cities will sign off on.

Serving Malibu, CA - Our Local Coverage Area

We’re based in the Malibu area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Home Additions & ADU in Malibu

Why Malibu Chooses Barrett & Sons Construction

We set the standard for home additions & adu in Malibu.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Malibu

Getting your home additions & adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your home additions & adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Malibu - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local home additions & adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Malibu Customers Say

Trusted by homeowners across Malibu and surrounding areas.

★★★★★

"Addition over the garage matched the original roofline and brickwork so closely that visitors do not realise it was added. He tracked down the closest brick he could find rather than settling."

Gideon Stroud · Verified customer
★★★★★

"The bathroom was finished on the day he said at the start, which nobody had led me to believe was possible."

Loretta Vanterpool · Verified customer
★★★★★

"His sons run the crews and they were in our house for four months. Not once did I feel I had to be home to keep an eye on things."

Camila Fuentes · Verified customer

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Dec 31, 2026
$40

$40 Off Any Repair Over $200

Expires Dec 31, 2026
Free

Free Second Opinion on Any Written Estimate

Expires Dec 31, 2026
Free

No Trip Charge Inside Our Own County

Expires Dec 31, 2026
10%

Senior & Veteran 10% - Always

Expires Dec 31, 2026

Ready for Home Additions & ADU in Malibu?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Malibu.

(877) 610-1318

Request a Free Estimate in Malibu

Tell us about your home additions & adu needs - we'll respond within the hour.

By requesting your free estimate, you accept our Privacy Policy and consent to receive communications through phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Us
Areas We Serve
Call Now - 24/7 Dispatch