Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Bedford
If you live in Bedford, you already know the situation: there’s no open land left to build on, and homes that were put up between 1960 and 1985 are now showing their age in ways that make families ask whether to move or to build out. A room addition in Bedford typically runs $45,000 to $130,000, and a detached ADU usually falls between $90,000 and $220,000. Before you spend a dollar on plans, though, you need a contractor who understands what Tarrant County clay does to a slab foundation and how to assess unpermitted work that was added decades ago. Barrett & Sons Construction has been building and remodeling in the Mid-Cities long enough to know Bedford’s quirks block by block. Call (877) 610-1318 and we’ll walk your property before you commit to anything.
Why Barrett & Sons Construction Is Bedford’s Preferred Home Additions & ADU Company
Tom Barrett founded this company in 1998, and his sons run crews across Bedford today. That’s not a marketing line; it means the name on the truck is the name that answers when something goes wrong. Bedford homeowners tell us the same story over and over: a national outfit quoted one price on the phone, then showed up with a different number after the contract was signed. We don’t work that way. Every scope change, every allowance adjustment, every single price movement arrives as a written change order before work proceeds. Tom publishes his name, his address, and his license number, and he’s glad to have you look it up before you sign anything. The permit inspector works for you, not for me, as Tom puts it, and we treat every inspection that way. If you’re in the 76021, 76022, or 76095 ZIP codes, a live person answers our phone 24/7, and Tom himself lives close enough to drive over and look at a problem the same afternoon.
Our Home Additions & ADU Services in Bedford
ADU Design & Permitting
Bedford sits inside a fully built-out, landlocked suburb, so the ADU you’re imagining probably has to fit into an existing lot with setback rules that have changed since your house was built. We handle the design, the Tarrant County permitting, and the inspection process from start to finish. We’ll tell you up front what’s allowed under current Bedford zoning and what isn’t, then draw plans that get approved the first time instead of bouncing back and forth with the city.
Garage Conversion ADU
Plenty of Bedford ranch homes have attached garages that were enclosed or partially converted decades ago, often without permits. A garage conversion to a livable ADU in Bedford runs $30,000 to $80,000, but the first step is always a review of what’s already there. We’ve found hidden wiring, undersized framing, and slab issues in garage conversions that looked fine from the outside. That’s exactly why we inspect before we quote, and why every permit gets pulled before a single stud moves. If you also need interior work done elsewhere in the house, we handle Kitchen Remodeling in Bedford and Bathroom Remodeling in Bedford as part of the same project timeline.
New Detached ADU
A new detached ADU in Bedford runs $90,000 to $220,000, and the number one factor is soil. The clay under Bedford expands when it’s wet and contracts when it’s dry, and a summer that pushes past 100°F after a wet winter puts real movement into the ground. We grade and compact the site, install proper drainage around the foundation, and pour a slab engineered for the soil conditions on your specific lot. That’s the difference between an ADU that stays square and one that starts cracking in the dry season.
Junior ADU & Interior Conversion
For homeowners who don’t need a full second kitchen, a junior ADU carved out of existing square footage is often the smartest move. Maybe it’s a master bedroom split into two units with a private entrance, or a side porch enclosed into a studio with a kitchenette. These projects run from the low end of the $45,000 range up depending on plumbing and electrical work. Homes in the older streets near central Bedford frequently have 60-amp or early 100-amp panels, so a big part of the planning is determining whether your electrical service can support the additional load before we touch the interior walls.
What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Bedford
When we install windows or doors as part of a home addition in Bedford, we’re putting in products you can look up: Simonton, Ply Gem, PGT, and CGI. These aren’t mystery brands off a van. They’re the same manufacturers we’ve installed across the Mid-Cities for years, and they hold up to North Texas heat and hail better than bargain alternatives. If a window fails during installation or shortly after, we can get replacement parts locally without waiting weeks because we work with these suppliers constantly. You’ll see the brand name on the paperwork before installation day, not after.
Common Home Additions & ADU Problems We See in Bedford Homes
- Expansive clay slab movement. Bedford sits on Tarrant County clay that shrinks and swells with moisture. Decades of wet winters and baking summers have shifted slabs and cracked load-bearing walls, and any addition has to account for that movement before new framing goes up.
- Unpermitted work from previous owners. Homes developed before 1975 around central Bedford routinely contain rooms or enclosed garages that were never inspected. When we open a wall for an addition, we often find wiring or framing that has to be brought to current code, and that discovery gets added to the written change order before we proceed.
- Undersized electrical service. Most of Bedford’s ranch homes were built with 60-amp or early 100-amp panels. Adding a bedroom, bathroom, or ADU frequently requires a panel upgrade, and we’ll tell you that before we start, not after the inspector flags it.
- Single-pane aluminum windows. The original windows in many 1960s and 1970s Bedford homes are single-pane aluminum. When you’re adding square footage, it’s the right time to replace the old windows too, and we can fold that into the addition scope with a single permit and single inspection cycle.
Pricing for Home Additions & ADU in Bedford, TX
We Also Serve Cities Near Bedford
Barrett & Sons Construction works throughout the Mid-Cities, including Home Additions & ADU in Bedford and the surrounding communities of Hurst, Euless, Colleyville, and North Richland Hills. The soil conditions, housing age, and permit requirements in these cities are similar to Bedford’s, and we bring the same written-change-order discipline to every job. If you’re in any of these towns, call us and we’ll come out the same week.
Serving Bedford, TX - Our Local Coverage Area
We’re based in the Bedford Roofing area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Home Additions & ADU in Bedford
How much does a home addition cost in Bedford?
A room addition in Bedford runs $45,000 to $130,000, and a full detached ADU runs $90,000 to $220,000. These ranges include permits, foundation work, and typical site prep for Tarrant County clay soil. Call (877) 610-1318 and we’ll give you an exact line-item quote for your specific property, free.
Do you pull permits for additions and ADUs in Bedford?
Yes. Every eligible Barrett & Sons job in Bedford includes permits pulled and inspections signed before we call the project complete. The permit inspector works for you, not for me, as Tom puts it, and we handle the paperwork from application to final inspection.
Will the price change once work starts on my Bedford home?
The only way your price changes is through a written change order that you approve before any new work happens. If we open a wall and find unpermitted wiring from a previous owner, we’ll stop, show you what we found, and put the cost to correct it on paper before we proceed. No surprise invoices at the end.
How long will an ADU or home addition take in Bedford?
A typical room addition takes 2 to 4 months once permits are issued. A detached ADU takes 4 to 8 months depending on site work and finishes. Weather, soil conditions, and the inspection calendar all play a role, and we’ll give you a timeline in writing before we start.
Do you offer a warranty on additions and ADUs in Bedford?
Yes. Every Barrett & Sons job is backed by our written 90-Day Done Right Promise. If something isn’t done right, Tom comes back and makes it right with one call. That’s on every contract we write, and it’s been that way since 1998.
Call (877) 610-1318 today and let’s walk your Windows & Doors - Bedford property together. We’ll tell you what’s possible, what it’ll cost, and what the permit process looks like before you spend a dime.
Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Bedford and the Mid-Cities since 1998.







Before
After
Before
After
Before
After