Home Additions & ADU in Arcadia, CA | Barrett & Sons Construction - Barrett & Sons Construction

Home Additions & ADU in Arcadia - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

953+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Fast, Reliable Home Additions & ADU Across Arcadia

Adding square footage to an Arcadia home runs $45,000 to $130,000 for a room addition, and $90,000 to $220,000 for a new detached ADU. On Arcadia’s high-end lots, most of that price is set by lead times on custom millwork, architectural glass, and specified finishes, not labor. Barrett & Sons Construction has been building in the San Gabriel Valley since 1998, and we know how the teardown-rebuild cycle in Arcadia’s 91006 and 91007 ZIPs changes the math on every permit, every foundation, and every change order. Call (877) 610-1318 and we’ll give you a written line-item estimate before anything gets ordered.

Why Barrett & Sons Construction Is Arcadia’s Preferred Home Additions & ADU Company

We’re the owner-operated team Arcadia homeowners call when they want the name on the truck to match the name on the contract. Tom Barrett started this company in 1998, and his sons run the crews that work in Arcadia every week. That means the person who signs your change order is the same person you’ll see at the lumberyard on Baldwin Avenue, not a rotating cast of dispatched strangers. Arcadia homeowners check license numbers, and Tom publishes his name, address, and license number straight on every bid. Look it up before you sign anything.

Our reputation in Arcadia comes from doing the unglamorous parts right. Permits pulled and inspections signed on every eligible job. Every allowance, every scope change, every material substitution arrives as a written change order before a single nail moves. The 90-Day Done Right Promise is written on every contract: if something isn’t right, one call brings Tom back. No arguing, no fine-print carve-outs. That’s why Arcadia customers who started with a garage conversion come back to us for a second-story addition five years later.

Our Home Additions & ADU Services in Arcadia

ADU Design & Permitting

Arcadia’s planning department processes a steady stream of ADU applications, and we know what the staff will flag before you pay for drawings. On a lot in the 91006 ZIP where the house above you drains toward your property line, we’ll flag the hillside drainage question in design, not after the permit is filed. We’ll prepare plans, pull permits, and carry the inspection schedule to sign-off. If the city asks for a revision, you get a written change order with the cost before we redraw anything.

New Detached ADU

A new detached ADU on an Arcadia lot with an existing 1960s ranch typically runs $90,000 to $220,000, and the spread is driven mostly by finishes and site work, not framing. On a flat 8,000 sq ft lot, the foundation is straightforward. If your lot backs up toward the San Gabriel foothills, we’ll engineer for drainage and possibly a retaining wall before the first concrete pour. We coordinate the utilities, the foundation, the framing, and the finish package as one scope with written allowances from day one.

Second Story Additions

Arcadia’s ranch homes from the 1950s and 1960s weren’t framed to carry a second story, so structural work gets real fast. We’ve shored load-bearing walls on 91006 homes with non-standard stud spacing that no modern table accounts for, then matched the new framing to the existing grid so the inspector signs off without a fight. If you’re adding a primary suite above a 1950s ranch, expect the structural scope to drive the schedule more than the finishes do. We’ll tell you that in the first walkthrough, not after demo starts.

Junior ADU & Interior Conversion

For Arcadia homeowners who want rental income or space for aging parents without a separate foundation, a junior ADU inside the existing footprint is the fastest permitted path. We convert garages, dens, and underused wings into code-compliant units with their own entrance, bath, and kitchenette. On an Arcadia block where the house next door just sold as a teardown, a junior ADU is often the financial bridge that lets you stay in the neighborhood while the market does what it does. Garage conversions in Arcadia typically run $30,000 to $80,000 depending on existing electrical, plumbing, and whether the slab needs repair.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (877) 610-1318

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Arcadia

We install brands Arcadia homeowners can look up before we order: KraftMaid and Cambria in kitchens and baths, Andersen and Marvin on windows and glass walls, GAF and CertainTeed on roofs, and Belgard and Techo-Bloc on hardscapes that tie the addition to the outdoor living space. When you pick a Cambria quartz countertop for a new ADU kitchenette in the 91007 ZIP, the allowance in your contract names that exact slab and color, in writing. We don’t substitute mystery materials off a van.

Common Home Additions & ADU Problems We See in Arcadia Homes

  • Hillside drainage surprises above the lot line. In Arcadia’s upper 91006 neighborhoods, water from slopes above your property follows paths that don’t show up on a standard survey. If we don’t confirm the drainage path before framing an ADU, you can hit a debris-flow easement that forces a retaining wall and pushes the draw schedule back by two months.
  • Flat-lot pricing on sloped foundations. A room addition on a grade change means the new foundation has to tie into the existing load path correctly. We’ve seen the alternative: a subfloor that isn’t tied to the new load-bearing point, and the whole rough-in has to come out and get redone. That’s a five-figure mistake we write into the scope from the start.
  • Lead times that stall the punch list. Custom millwork and architectural glass can sit in a manufacturer’s queue for ten to fourteen weeks. If the contract doesn’t lock the lead time into the schedule, the framing and drywall get done and then everything waits. We order long-lead items the week the permit is issued, not after rough-in.
  • Feng shui requirements caught too late. In Arcadia’s custom home market, front door orientation, stair placement, and room-over-garage concerns are framing-level decisions. If we’re past the framing stage when the spec comes in, the fix involves structural work, not paint. We ask these questions in the first design meeting.

Pricing for Home Additions & ADU in Arcadia, CA

Here’s what we’re quoting Arcadia homeowners right now for common scopes. These are real ranges we’ve written into recent contracts in the 91006, 91007, 91066, and 91077 ZIP codes.

Scope Typical Arcadia Range
Home Addition $45,000-$130,000
ADU Construction $90,000-$220,000
Garage Conversion $30,000-$80,000
Countertop Installation $2,000-$6,500

What moves the number on an Arcadia addition is rarely labor rates. It’s the allowance package: custom millwork, architectural glass, specified plumbing fixtures, a Cambria slab versus a stock top. On a hillside lot, soil and drainage engineering can add real money before framing starts. Every number in our proposal is written, and every change to that number comes as a written change order before the work changes. Call (877) 610-1318 and we’ll walk the property, measure, and give you a line-item estimate you can actually compare against another bid.

We Also Serve Cities Near Arcadia

Besides our work across Arcadia, our crews cover Mayflower Village, Sierra Madre, Monrovia, and Temple City for Home Additions & ADU projects. If you’re a few blocks over the line in Monrovia or Temple City, the same crews, the same written change order policy, and the same 90-Day Done Right Promise apply.

Serving Arcadia, CA - Our Local Coverage Area

We’re based in the Arcadia area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Home Additions & ADU in Arcadia

How does the teardown-rebuild pattern on my Arcadia street affect the permits for a room addition?

If your Arcadia block is actively going through mansionization, your room addition permit will be reviewed next to applications for 5,000 to 8,000 sq ft new builds, which means the city’s planning staff is already scrutinizing setbacks, lot coverage, and height limits carefully. We sequence our work so noisy demo and structural shoring doesn’t conflict with a teardown two doors down, and we set your finish expectations against what the neighbors are building. Call (877) 610-1318 to have us walk your lot and tell you what the current review climate means for your specific scope.

Can I put a detached ADU on an 8,000 sq ft Arcadia lot that still has a 1960s ranch home?

Yes, in most cases. An 8,000 sq ft lot in Arcadia can usually accommodate a detached ADU behind or beside the existing ranch, provided setbacks, lot coverage, and the hillside drainage path above the lot line all check out. We’ll confirm the drainage path during design, not after the permit is filed. Call (877) 610-1318 for a free site walk in the 91006, 91007, 91066, or 91077 ZIP codes.

What feng shui requirements actually change the framing of a second story addition in Arcadia?

In Arcadia’s custom home market, we regularly frame around front door orientation, stair placement away from the entry line, and avoiding bedrooms directly over a garage. These are structural and architectural decisions made before the first stud goes up, which is why we ask about them in the initial design meeting. If they come up after framing, the fix is structural. For a second-story addition where you want the stair placement and entry alignment handled correctly, call (877) 610-1318.

Why does the lead time for custom millwork or architectural glass drive the schedule more than labor on an Arcadia addition?

Because the manufacturer’s queue is what it is, and no amount of crew speed shortens it. Custom millwork and specialty glass walls can sit in production for ten to fourteen weeks, and if the contract doesn’t lock that lead time into the schedule, the whole punch list stalls. We order long-lead items the week the permit is issued. For an Arcadia addition where the allowance package names the exact millwork and glass, call (877) 610-1318 and we’ll show you the order lead times in writing.

Do Arcadia hillside drainage rules apply to a flat-lot ADU in the 91006 ZIP?

They can. Even if your lot is flat, the hillside drainage path above the 91006 lot line may cross your property, and the city can require engineered drainage or a retaining wall before it signs off on an ADU. We check that during design, so the first change order isn’t a surprise. For a flat-lot ADU in the 91006 ZIP where the drainage question is answered before you pay for drawings, call (877) 610-1318.

Get Your Arcadia Home Addition or ADU Priced in Writing

If you’re planning a room addition, a new detached ADU, or a garage conversion in Arcadia, start with a written line-item estimate from a contractor who puts his name on the contract. Tom Barrett and his sons run the crews in Arcadia every week, and every scope, every allowance, and every price change comes in writing before the work changes. Call (877) 610-1318 today to schedule your free estimate. We’ll walk the property, talk about lead times, hillside drainage, and feng shui framing constraints, and hand you numbers you can compare line by line.

Written by Tom Barrett, Owner at Barrett & Sons Construction, serving Arcadia since 1998.

Why Los Angeles Chooses Barrett & Sons Construction

We set the standard for construction in Los Angeles.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Los Angeles

Getting your construction handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your construction needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Los Angeles - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Los Angeles Customers Say

Trusted by homeowners across Los Angeles and surrounding areas.

★★★★★

"Every change to the price came as a written change order before the work happened, not as a surprise on the final bill. I did not know contractors still did that."

Xiomara Benavides · Verified customer
★★★★★

"Tom Barrett was on our job most days himself, not just at the quote and then never again. When something needed deciding there was an actual person to decide it with."

Rosalie Pemberton · Verified customer
★★★★★

"Came back a year later to sort a door that had dropped as the frame settled. No charge and no argument about whether it was covered."

Thaddeus Oyelowo · Verified customer

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Dec 31, 2026
$40

$40 Off Any Repair Over $200

Expires Dec 31, 2026
Free

Free Second Opinion on Any Written Estimate

Expires Dec 31, 2026
Free

No Trip Charge Inside Our Own County

Expires Dec 31, 2026
10%

Senior & Veteran 10% - Always

Expires Dec 31, 2026

Ready for Construction in Los Angeles?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Los Angeles.

(877) 610-1318

Request a Free Estimate in Los Angeles

Tell us about your construction needs - we'll respond within the hour.

By requesting your free estimate, you accept our Privacy Policy and consent to receive communications through phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Us
Areas We Serve
Call Now - 24/7 Dispatch