James Hardie Bathroom Remodeling Nationwide | Barrett & Sons Construction

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

James Hardie Bathroom Remodeling: The Los Angeles Owner’s Guide

If you have a James Hardie bathroom and it’s starting to fail around the shower walls, tub surround, or backing boards, here’s what you need to know: a full James Hardie bathroom remodel in Los Angeles typically runs $10,620 to $33,040 installed, and we keep HardieBacker and HardieBacker HydroDefense on the truck for same-week tear-outs. That means we can usually have your old fiber-cement board out and fresh, properly flashed HardieBacker in within a few days once you approve the written scope. Most homeowners find the problem when grout keeps cracking, caulk pulls away at the tub line, or a tile pops off the wall and you see soft, swollen board underneath.

Call (877) 610-1318

We’re Barrett & Sons Construction, and we’ve been doing this in Los Angeles since 1998. We’re an independent contractor, not affiliated with James Hardie. We stock their boards because they hold up to this city’s humidity swings and the hard water mist that settles in every bathroom from Encino to Eagle Rock. Tom Barrett’s name is on the truck, and his sons run the crews.

Which James Hardie Models This Applies To

In a bathroom, James Hardie product almost always means HardieBacker cement board, not their siding. Two versions matter here. The standard HardieBacker 500 (½-inch, 3×5 sheets) is the workhorse for tub surrounds and shower walls. The newer HardieBacker HydroDefense has a built-in waterproofing barrier coating, which matters in Los Angeles because our older homes, especially in the San Fernando Valley where Tom grew up, have framing that moves with the wet-dry seasons. A board that’s waterproof at the surface buys you time when a corner bead or window seam eventually opens up.

The compatibility gotcha nobody tells you until the job starts: HardieBacker 500 is not waterproof. It’s water-durable. It will not rot or crumble, but water passes through it over time, which means it still needs a surface membrane or a properly vented, properly flashed assembly behind it. If your last contractor skipped that step, the board may still be in one piece while the studs behind it are not. That’s a Los Angeles reality we open up on nearly every older bathroom we touch. Check the printed label on an exposed edge. ½-inch HardieBacker feels like a strong, dense board with a rough fiber-cement face. The HydroDefense version has a darker coating and a visible water-shedding surface texture.

Signs Your James Hardie Bathroom Remodeling Is Failing

  • Grout cracking in a straight line down a corner joint. The framing behind the board has moved or there’s no expansion allowance at the change of plane. HardieBacker is rigid; when the house shifts, the board doesn’t flex, so the grout takes the stress.
  • Caulk pulling away from the tub line within weeks of re-caulking. Moisture has swollen the board edge or the substrate behind it. Caulk can’t hold on a mushy surface, no matter how many times you redo it.
  • Tiles popping off with the thin-set still stuck to them. That means the bond between thin-set and the HardieBacker failed, usually from surface contamination, dust from dry-fitted cuts, or a waterproofing coating applied before the board was fully dried.
  • A hollow sound when you tap the shower wall from the other side. Softened framing behind the board, or the board itself has begun delaminating at a fastener line. On a slab-on-grade Los Angeles bathroom, this often traces back to a slow drain or failed wax ring leaking into the wall cavity.
  • Dark staining at the bottom 6 inches of the shower surround. Wicking from a missing, poorly sloped, or improperly detailed wall-floor connection. HardieBacker should never sit in standing water, but on a pre-slope gone wrong, that’s exactly what happens.

Replacement Cost & What’s Included

A full James Hardie bathroom remodel in Los Angeles runs $10,620 to $33,040 installed, and the spread depends on whether we’re opening one shower wall or gutting the whole room to studs, moving a drain line, and rebuilding the waterproofing from scratch. A small bath or targeted HardieBacker replacement lands in the $5,900 to $14,160 range when the framing underneath is sound. A walk-in shower build with HardieBacker HydroDefense, a tiled pan, and new valve body can run $5,310 to $14,160 on its own.

What’s included on every Barrett & Sons bathroom job: demolition of the failed board, framing inspection and repair as needed, code-required waterproofing details at corners and penetrations, new HardieBacker installed with the specified fastener pattern, tile-ready surface, full cleanup, and a written 90-Day Done Right Promise on the work. Every scope, every allowance, every price change comes to you as a written change order before any work starts. No surprise invoices at the end. The permit gets pulled and the inspector signs off. That last part isn’t optional with us.

DIY or Call Us?

There’s a big difference between what you can safely check and what you should not touch. You can do this yourself: look for cracked grout lines, tap for hollow spots, peel back caulk to see if the board underneath is dark or soft, and note any discoloration near the tub edge. Those observations help us price the job over the phone. What you should not do is cut into shower walls, open a tub surround, or pull tile off a wet board unless you know what’s behind it and how it was waterproofed. Once you remove a tile, you’ve broken the waterproofing plane, and every day the shower gets used after that pushes more moisture into places you can’t see. If there’s a chance the last contractor skipped a pan liner or corner flashing, that is not a weekend fix. Call us at (877) 610-1318 and we’ll come look. The trip is free inside Los Angeles County.

FAQs

Need Construction help nationwide? Licensed & insured · Free written quotes response · free estimates
Call (877) 610-1318
Areas We Serve

Request a Free Estimate

Tell us what you need - Barrett & Sons Construction responds fast. No obligation.

By requesting your free estimate, you accept our Privacy Policy and consent to receive communications through phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Us
Call Now - 24/7 Dispatch